GENERAL COMMITTEE MEETING MINUTES 19 APRIL 2022
c. all utility services and connections (eg. electricity, telecommunications, water,
sewerage) are wholly located within the lot they serve or alternatively included within
an easement
d. all existing effluent disposal areas are wholly located within the lot they serve and
comply with the boundary setback requirements of the Plumbing and Drainage Act
2002 and associated codes and requirements
e. all dams (including ponded water, dam walls and associated spillway structures) are
wholly located within the boundaries of a single lot
f. all retaining walls and structures are fully contained within the lot they retain any fill,
including fill batters, are wholly contained within the subject site and not on adjacent
properties
External Works
48. The table drains in the verge areas in the frontage of the subject site to Glenridge Drive must
be reconstructed to be free draining. The works must be undertaken in accordance with an
Operational Works approval and must include in particular:
a. The frontage of proposed Lot 8 must be completed prior to the sealing of the survey
plan for Stage 1
b. The remainder of the frontage, including the proposed intersection, must be completed
prior to the sealing of the survey plan for Stage 2. The intersection must be constructed
generally in accordance with drawing No. 21598-P002, Revision B prepared by TOD
engineers.
Condition 48 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
infrastructure.
49. A new intersection must be constructed joining Glenridge Drive with the new road. The works
must be undertaken in accordance with an Operational Works approval and be completed
prior to the sealing of the survey plan for Stage 2. The intersection must be constructed
generally in accordance with drawing No. 21598-P002, Revision B prepared by TOD
engineers, the Engineering Report Document No. 21598_RP1, Revision B prepared by TOD
engineers dated 24 March 2022 and must include in particular:
a. an intersection with vehicle priority maintained on Glenridge Drive
b. provision of sight distances adequate for the design speed of the road
c. truncation of the new property boundaries
Condition 49 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
infrastructure.
New Roads
50. The new road as shown on the Approved Plans must be constructed and dedicated as “road”.
The works must be undertaken in accordance with an Operational Works approval and be
completed prior to the sealing of the survey plan for Stage 2. The works must include in
particular:
a. a reserve width of 20 metres with widening at the cul-de-sac head and generally in
accordance with the approved plan
b. a cross section generally in accordance with drawing No. 21598-P002, Revision B
prepared by TOD engineers
c. a cul-de-sac head generally in accordance with drawing No. 21598-P002, Revision B
prepared by TOD engineers and Council’s Planning Scheme Policy 6 – Engineering
Design Standards
d. table drains and culvert drainage generally in accordance with drawing No. 21598-
Page 32 of 39