PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007
APPENDIX C: LANDSLIDE RISK ASSESSMENT
QUALITATIVE TERMINOLOGY FOR USE IN ASSESSING RISK TO PROPERTY
QUALI7A17IVE MEASURES OF LIKELIHOOD
Appruxiinate Annual Probability
Implied Indicative Landslide
Indicative Notional Recurrence Interva l Description Descriptor Level
Value Bouudaly
10 5 i 102 10 ears The event is expected to occur over the design life. ALMOST CERTAIN A
20 years The evert{ will probably occur under adverse conditions over the
I0 ` 100 years LIKELY II
design Inc.
f
Sx10 ' 200 years
1Q _ 1000 ourA The event could occur under adverse conditions over the design life. POSSIBLE C
5x19 ^ _ y 2000 veers
The event might occur under very adverse c;rci ristances over the
1Q t 10,ooo years UNLIKELY D
-' design life.
Sx]G 20,000 years
lU-' The event is conceivable but only under exceptional circumstances
100.000 years RARE T
over the design life.
IQ _, 5x 1 0 200,000 veers
1.000 000 years the event is inconceivable or fanciful over the design life. BARELY CI EDIBLE F
Note: (1) The table should bo used from loft to right; use Approximate Annual Probability or Description to assign Descriptor, not vice versa.
QTIA1.17ATIVP. MEASURES OF CONSEQUENCES TO PROPERTY
Approximate Cost of Damage
Description Descriptor L eve l
Indicative Notional
Value Boundary
Stricture(s) completely destroyed and/or large scale damage requiring major engineering works for ,
20Ct9'o CA'fA5'f1LU1 hl1C 1
stabilisation. Could cause at least one adjacent proporty major consequence damn e.
100 1/0
Extensive dmnage to most of structure, and/or extending beyond site boundaries requiting significiinI 2
60% MAJOR
stabilisation works. Could cause at least one adjacent rort medium conve uencc dania •c.
'10%
Moderate damage to some of structure, and/or significant part of site requiring large stabilisation works. 3
20% MEDIUM
Could cause at least one adjacent propccty minor consequence damn ge.
10% 4
5% lobo Limited damage to rt of structure, and/or part of site requiring some reinstatement stabilisation works. MINOR
Little damtage. (Note for high probability event (Almost Certain), Ili is category may he subdivided at a 5
0 5, INSIGNIFICANT
notional boundary of 0.1%. See Risk Muhi.x.)
Notes: (2) The Approximate Cost of Damage is expressed as a percentage of market value, being the cost of file improved value of the unaffected property which includes the land plus the
mnat'iitcied struchuas.
(3) The Approximate Cost is to be an estimate of the direct cost of the damage, such as the cost of reinstatement of the damaged portion of the property (land plus structures), stabilisation
woii:s required to render the site to tolerable risk level for the landslide which has occurred and professional design fees, and consequential costs such as legal fees, temporary
aecurntnodalion. L does not include nddilional stabilisation works to address other landslides which may affv t the property.
'I'hc table should be used from left to right; use Approximate Cost ofDaniage or Description to assign Descriptor, not vice versa
91 Australian Geornechanics Vol 42 No 1 March 2007
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 of 2 - Plans 7 Banksia Avenue Noosa HeadsRelated documentApplication case desk ↗
About this file
- File size
- 8.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.