Original source · versioned page text
2020-10-12 GC Agenda - Item 6 - Attachment 1 - Proposal
Very large file: it may take a few minutes
The original of this document is very large (21.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
REV DESCRIPTION DRN DATE
A MCU DA Issue MS 02.03.20
25.02.20
Generally throughout: B MCU DA Issue MS 06.03.20
02.03.20
- New render and paint finish to all external walls C Client
MCU DA Revisions
Issue MS 14.04.20
06.03.20
- New anodised aluminium (25µm coating) D MCU
ClientDA
Revisions MS 05.08.20
14.04.20
E Information
MCU DA Response MS 05.08.20
sliding doors to terraces / balconies Information Response
- New anodised aluminium (25µm coating) windows
- New frameless glass balustrade with
anodised aluminium (25µm coating) uprights
- New tiles to walkways, terraces and balconies
New 200 x 50 powdercoated aluminium awning portal New 'PosiGlaze' balustrade system. New 200 x 50 powdercoated aluminium awning Select new aluminium or
Awning portal frames New clear anodised aluminium
Property Boundary
frame to future detail, supported by RHS columns with 15 m height line - End Base channel 75 mm off side frame with powdercoated 'timber-look' Existing Lift Core zinc panel roof sheeting
to Units 401, 402, 403 sliding doors to terraces /
select powdercoated 'timber-look' aluminium battens measured from NGL at face of building walls with stainless steel toprail. Refer aluminium battens under and select 01 core behind panels at equal centres over
& 405 behind balconies, generally throughout
over and 50 x 50 SHS capping to top of frame to DD80 series for more details polycarbonate roof sheeting over to future detail existing mass roof structure
ROOF TERRACE
SECOND FLOOR
EXISTING RESTAURANT -
NO WORKS
Carpark
Carpark
GROUND FLOOR
200 x 50 powdercoated aluminium New 1800 high frameless 200 x 50 powdercoated aluminium awning
New concrete pavers /
New clear anodised aluminium awning frame supported by reinforced New frameless glass pool fence Existing pool to be translucent glass pool fence frame cantilevered off existing wall and
stepping stones on gravel bed
sliding doors to terraces / concrete blade columns. Provide 50 x 20 and gate on anodised aluminium modified with additional and gate on anodised supported by new reinforced concrete columns.
connecting basement stair,
balconies, generally throughout battens to underside of frame, select spigot fixings to future detail area and kids pool aluminium spigots Provide 50 x 20 battens to underside of frame,
entry and outdoor shower
polycarbonate roof sheeting over surrounding Unit 205 terrace select polycarbonate roof sheeting over
SECTION C
Scale 1:100
Suite 2,
Cnr Gard
Alexand
PO Box
P 07 54
admin@
SUNCOAST RESORT BUSINESS CENTRE
SUITE 2 CNR GARDAK ST & SURF RD
ALEXANDRA HEADLAND Qld 4572
PO BOX 6232 MAROOCHYDORE BC Qld 4558
PH : 07 5443 5028 FAX:07 5479 2380
ABN 23 123 917 724
EMAIL: [email protected]
project
PROPOSED ALTERATIONS &
ADDITIONS TO EXISTING
RESORT BUILDING
for
NETANYA RESORT
at
75 HASTINGS STREET
NOOSA HEADS
drawing
NEW WORKS - SECTION
AS SHOWN
date 5/08/2020 drawn JP scale @A1
drawing no. 19021 SD30.03 revision D
Copyright of this document remains the exclusive
property of SPROUT ARCHITECTS PTY LTD
ABN 23 123 917 724.
Contractors are to verify all dimensions and levels on
site prior to commencing. Report all discrepancies to
the Architect. Use figured dimensions in preference
0 5 10 20 to scaled.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.