SUPERSEDED Negotiated Decision Notice - 010.2007.00001841.001 [As Published] · 132007.1841
2007/1841
67.3. A fire service (fully testable single detector check with metered bypass), where
applicable, for flows to fire hydrants and fire sprinkler systems (excluding fire hose
reels).
68. Fire hydrants are to be provided throughout the development in accordance with Council
Engineering Design Standards and in accordance with Queensland Fire Service Standards.
Service Easements (Sewer / Stormwater)
69. A registered easement shall be created over the zone of influence of all sewers within the
subject site and over those parts of the subject site that are impacted upon by sewers on any
adjoining sites. The easements shall generally be parallel to and centred over the sewer main
and be equivalent in width to twice the depth to invert level of the sewer at the deepest point
within the allotment (measured from the finished surface) and be no less than 3.0m wide
overall. In this regard a licensed surveyor shall accurately locate all sewer mains and
determine the necessary width of the easement, which shall be shown on any plans submitted
for Operational Works / Building Works approval. To this extent the surveyor shall certify that
the sewer and the zone of influence is wholly contained within the easement to be created.
In addition to this the Applicant’s Solicitor shall give Council’s Solicitor an appropriate
undertaking in writing that the Title Deed and the easement documents will be lodged at the
Land Titles Office and any additional Titles Office forms or requisitions requiring the consent of
Council will be attended to promptly.
A duly executed copy of the easement shall be submitted to Council for perusal prior to the use
commencing.
Any changes required by Council’s Solicitor must be corrected immediately.
70. A registered easement shall be created over any stormwater drainage pipes within the site that
collect stormwater from a Council road or convey stormwater from any adjoining property (for
example, where drainage pipes are provided within the site to prevent adjacent properties from
additional ponding/flooding due to the subject site being filled).
71. No building or other structure shall be constructed or encroach over an easement.
Earthworks
72. Earthworks required on site shall be carried out in accordance with Section 3.8 of Council’s
Engineering Design Standards Manual and so as not to cause the additional ponding of water
on any adjoining lands or the blockage of, or interference with, any natural watercourses.
73. Earthworks carried out on site shall not affect the structural integrity of any of the existing
fences and/or structures and/or lands that border the development site. Fences that are
affected shall be replaced prior to the Building Certifier issuing the Certificate of Classification.
In this regard any fences to be replaced shall be clearly shown on the plans submitted for
Operational Works approval.
Acid Sulfate Soils
3
74. As the site is located below the 5m AHD, any excavation works consisting of 100m or greater
3
and/or any filling works consisting of 500m or greater and with an average depth of 0.5m or
greater will need to be carried out in accordance with State Planning Policy 2/02 Planning and
Managing Development Involving Acid Sulfate Soils. In this regard appropriate testing and
supporting documentation prepared by a suitably qualified specialist shall be submitted to
Council for approval prior to obtaining a Development Permit for Operational Works.
10 of 19
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED Negotiated Decision Notice - 010.2007.00001841.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 91 KB (small file)
- File type
No other editions are linked here.