Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

SUPERSEDED Negotiated Decision Notice - 010.2007.00001841.001 [As Published] · 132007.1841

of 19

Text shows just the words. Original shows the document exactly as it was published.

                                                                                         2007/1841



Erosion and Sediment Control
75.   Any person acting on this permit shall prevent erosion and sediment export from leaving the
      site. Site control measures such as silt fencing, controlled gravel access to the site and
      controlled disposal of waste, will be necessary.
      In this regard plans detailing the methods of controlling erosion and sediment are required to
      be submitted to the Council for approval prior to obtaining a Development Permit for
      Operational Works.

Contributions Towards Council Infrastructure
76.   Monetary contributions shall be paid to Noosa Council towards the cost of providing and/or
      upgrading various infrastructure at the rates applicable at the time of payment. An estimate
      only of the contribution amounts under the current Council policies and requirements is
      outlined in the table below:

       Contribution Required For:                                                              Amount:
       PSP12 – Public Open Space Contributions (Park)
                                                                                               Nil
       (Land dedicated in lieu under lot reconfiguration approval 2006/1594)
       PSP16 – Sewerage Headworks Contributions                                                $27,083
       PSP20 – Pathway Trunk Network Contributions                                             $19,928
       TOTAL Contribution Amount =                                                             $47,011
       Please note, that these amounts are all subject to variations in the Consumer Price Index, All
       Groups Brisbane from DECEMBER 2007 until the date of payment.

      All contributions must be paid prior to the issue of a Development Permit for Operational
      Works.

      Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the
      contributions not be paid at the due time, Council shall call upon the trading bank guarantee in
      full.

      Processing of bonds for security where specific Council approval has been given for the
      bonding of contributions will incur an administration fee in accordance with Council’s Land
      Development Commercial & Regulatory Fees at the time of lodgement.

      In the event that the Development Permit for Material Change of Use of Premises lapses or is
      cancelled, the trading bank guarantee will be returned.

General
77.   A suitably qualified Registered Professional Engineer shall prepare engineering drawings and
      specifications for all engineering works that will become Council infrastructure, which shall be
      submitted in conjunction with an application for a Development Permit for Operational Works.
      To avoid conflict with underground pipes or services, all existing and proposed services
      required by the development shall be shown on the plans.
78.   Any alteration of any public utility or other facilities necessitated by the development of the land
      or associated construction works external to the site shall be at no cost to Council.




                                                                                           11 of 19

Used in these records

About this file

File size
91 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SUPERSEDED Negotiated Decision Notice - 010.2007.00001841.001 [As Published].pdf · 91 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.