INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                    21 JULY 2015



SECTION              RECENT ACHIEVEMENTS                             CURRENT PRIORITIES                           LOOKING AHEAD
Strategic Land Use                                                      Noosa River Hydrodynamic modelling
Planning (cont.)                                                          to be tendered
                                                                        Flood management strategy
                                                                        Assistance with Social Plan
                                                                        Assistance with Local Economic Plan
                                                                        SEQ Regional Planning Committee
                                                                          GIS review including consistent
                                                                          templates and processes
Asset Management        Implementation of the Technology One          Asset management plan development          Further development of work order
Planning                  (T1) mobility system for Revetment Wall         continues.                                   management system to improve asset
                          inspections.                                  Further implementation of mobility           management outcomes
                        Finalisation of the capital works budget        capability across other asset classes      The development of a storm-water
                          development for 2015/16                         and business areas                           asset renewal and pipe relining
                        Asset condition assessment of the             Development of reporting capabilities        programme.
                          sealed road network is completed and            within the T1 asset system and time-
                          data is currently being loaded into             sheeting by Work Order.
                          pavement management system for                Development of a 10 year capital
                          development of a reseal programme.              programme.

Infrastructure          Designs and documentation of new              Supply & installation of Noosa style       Development of new rural bus shelter
Planning & Design         Noosa style bus shelters                        coastal bus shelters                         prototype
                        Tender awarded for supply ad                  Finalisation of PTAIP 2014/15 – bus        Planning and design of PTAIP 2015/16
                          installation of new Noosa style bus             stop disability compliance (now              bus stop disability compliance
                          shelters                                        confirmed)                                 Planning and design of 2015/16 capital
                        Gibson Road – design & documentation          Design and documentation of Dr Pages         works programme
                        Cooroy Noosa Road Stage 1 – design              Road                                       Road directional signage review
                          and documentation                             Survey, design, consultation and           Hilton Terrace and Ernest Street
                        Wallace Park Shared Pathway –                   documentation of Park Road Boardwalk         (Goodchap St) intersection planning
                          detailed design, documentation &              Design and documentation of Cooroy           and design
                          construction                                    Noosa Road Stages 2-6                      Standard Drawings review
                        Tewantin Park Shared Pathway –                William Street geotechnical
                          detailed design, documentation &                investigation, design and
                          construction                                    documentation
                                                                        Ben Lexcen Drive school crossing
                                                                          improvements design & documentation



                                                                                        Page 5 of 48
Log in to download the original file

2015-07-21 Infrastructure and Services Committee Agenda(PDF, 1MB).pdf · 1.2 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.