2015-07-21 Infrastructure and Services Committee Agenda

of 48

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                      21 JULY 2015



SECTION               RECENT ACHIEVEMENTS                              CURRENT PRIORITIES                            LOOKING AHEAD
Civil Operations         2015/16 Budget development                     Develop 2015/16 Road Reseal &               Development of Noosa Tree Policy
                         Delivery of significant road works               Rehabilitation Programme                      guidelines
                           projects including resurfacing on Gibson       Commence works identified in the Fire       Develop a Fire Management Strategy
                           Road, Noosaville; Cooroy-Noosa Road,             Management Plan for Noosa Shire.              for Bushland Reserves and Road
                           Tewantin and David Low Way, Sunrise            Implementation of recommendations             Reserves
                           Beach                                            from both the Natural Areas and Parks       Delivery of 2015/16 Renewal
                         Fire Management Plan for Noosa Shire.            Service Reviews                               Programmes including: Gravel Road,
                         Remediation of heritage fig tree in            New tender/panel arrangements for             Re-sheeting Road Surfacing &
                           Poinciana Ave fronting RSL Park,                 expiring materials and services               Rehabilitation, Stormwater Pit
                           Tewantin                                         contracts                                     Replacement
                                                                          Recruitment of Parks and Natural Areas      Review the strategic direction and
                                                                            Co-ordinator                                  associated structural arrangements
                                                                                                                          within the Civil Works and Maintenance
                                                                                                                          section
Building & Plumbing      Met legislative time frames for Plumbing       Compliance Certificates received and        Maintain legislative time frames with
Services                   approvals.                                       processed within two business days.           existing resources
                         Met response timeframe for plumbing              (average turnaround = 1 day)                Development of more detailed trading
                           information request.        (legislative       Compliance Permits received are being         activity reports for Council
                           requirement 10 days)                             process within twenty days (average          Certification sign off (QFRS) of
                         Met response timeframe Referral                  turnaround = 7 days)                           Council’s electrical fire system
                           Agency Building. (legislative                  Referral Agency Buildings being              Development and implementation of
                           requirement 10 days)                             processed within 6 days (decision              new access system to Council
                         Preparations for transfer of Building and        and/or request for info)                       Libraries.
                           Facilities Functions and Resourcing            Installation of Fire control system at
                                                                            Council Noosaville Depot
                                                                          Introduction of the new electronic
                                                                            access system to Council’s
                                                                            Administration Building and Noosaville
                                                                            Depot




                                                                                          Page 6 of 48
Log in to download the original file

2015-07-21 Infrastructure and Services Committee Agenda(PDF, 1MB).pdf · 1.2 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.