The following broad project objectives have been drawn from these principles.
Engage with the community through the PRG to collaboratively develop the design and
planning.
Achieve a Noosa ‘Look and Feel’ that reflects Noosa’s values for protection of the
environment and provision of quality infrastructure.
Recognise the high usage and potential future demand on this boardwalk but not cater for
maximum demand at the expense of the natural environment;
Utilise materials and features that enhance the unique and natural experience of the site.
Explore innovative solutions to deal with the engineering constraints such as poor
geotechnical conditions.
3. INVESTIGATIONS IN PROGRESS
As part of scoping the project, extensive investigation is in progress to inform the project, this
includes but is not limited to:
Review of previous stages from Hastings Street to Little Cove;
Review of previous community submissions;
Undertaking a survey of the site (in process);
Carrying out geotechnical investigations (in process);
Carrying out flora fauna investigations; and
Reviewing legislation and planning processes that apply.
4. NEXT TASKS
Whilst in the progress of carrying out initial investigations, staff propose to carry out the following
tasks:
1 Establish an internal project control group;
2 Re-establish and engage with the Park Road Boardwalk PRG to develop the concept
design, noting the previous PRG comprised representatives from the following:
Tourism Noosa
Noosa Biosphere Association
Noosa Parks Association
Friends of Noosa
Koala Diaries
Hastings St Association
Noosa Residents and Rate Payers Association
Queensland Parks and Wildlife Service
2 x Residents from Little Cove;
3 Engage with Kabi Kabi/Gubbi Gubbi representatives, local environmental groups and the
surfing community seeking input into how cultural heritage can be incorporated into the
design;
4 Complete geotechnical investigations and survey;
5 Complete flora and fauna investigations; and
6 Engage with the Project Reference Group to further develop concept designs and bring
designs back to Council for endorsement to proceed to detailed design.
Previous Council Consideration
Nil
Page 9 of 48
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.