ORDINARY MEETING MINUTES 18 DECEMBER 2014
Earthworks and Retaining Walls
31. All fill and associated batters must be undertaken in accordance with an
Operational Works approval, and contained entirely within the subject site
unless written permission from the respective landowner(s) is provided to
Council.
UNITYWATER
The following Unitywater conditions are applied in accordance with the South East
Queensland (Distribution and Retail) Restructuring Act 2009 and Unitywater’s Interim
Connections Policy. The conditions below form part of a water connection aspect
which are taken to be a water approval for a staged connection. Any future
applications must be made to Unitywater under South East Queensland (Distribution
and Retail) Restructuring Act 2009. Unitywater can be contacted as follows:
Phone: 1300 0 Unity (1300 086 489)
Email: [email protected]
Web: www.unitywater.com
32. Reticulated water must be provided to each lot in the development. This must
include:
a. Ensuring that internal water pipes are wholly contained within the lot they
will serve.
b. An approved water meter for each lot in accordance with Unitywater and
SEQ Standard Drawings.
c. Provision of a water service from the existing 100mm diameter water
main to service located in Blue Wren Place to service each lot within the
proposed subdivision in accordance with Unitywater and SEQ Standard
Drawings.
d. Water meters must be located on alternative boundaries to electrical
pillars
e. The fire-fighting demand on Unitywater’s water supply system from the
development must not exceed 15 litres per second
33. Reticulated sewerage must be provided to each lot in the development. This
must include:
a. Ensuring sewer house drains are wholly contained within the Lot they will
serve.
b. Provision of sewerage infrastructure to within the property boundaries of
each Lot within the proposed subdivision.
34. A minimum clearance of 1.5 metres must be maintained between Unitywater
sewers and proposed building envelopes, buildings and other structures
35. Easements of between 3 and 10 metres must be provided over all Unitywater
sewers located within property boundaries in accordance with the SEQ
standards. Easements shall be centred over the pipe. Easement terms shall be
the most current registered dealing held by the Department of Natural
Resources & Mines and shall not be altered or amended.
36. Stormwater retention systems and gross pollutant traps must maintain a
minimum clearance of 1.5 metres from Unitywater water supply and sewerage
infrastructure
This is not an official copy of Council’s Minutes
Page 11 of 58
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.