Original source · versioned page text
2014-12-18 Ordinary Meeting Minutes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ORDINARY MEETING MINUTES 18 DECEMBER 2014
b. bioretention devices which:
i. are designed generally in accordance with IPWEQA Standard
Drawing No. WSUD-001
ii. are designed to ensure that flows which exceed the treatment
capacity of the device avoid damaging of the filter media or
subjecting the filter media to excessive sediment loads
iii. are provided with a free-draining outlet from the sub-soil drainage
system
22. Where bio-retention devices (or similar) are required within a residential
allotment the devices:
a. must be installed prior to the sealing of the Survey Plan
b. must be protected by a covenant.
c. a maintenance handbook, able to be provided to future owners, must be
prepared for the system to outline how the system works and the level of
maintenance that will be regularly required. The maintenance handbook
must be submitted to Council for approval and for records purposes prior
to the sealing of the Survey Plan.
23. Detailed life cycle costing must be prepared for the stormwater quality
treatment system by a Registered Professional Engineer Queensland and
submitted to Council prior to the issue of any Development Permit for
Operational Works.
Electricity and Telecommunication Services
24. Underground reticulated electricity and telecommunication services must be
provided to each lot in accordance with an approval for Operational Works and
the standards and requirements of the relevant service provider.
25. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits,
pits and pipes to accommodate the future connection of optic fibre technology
telecommunications.
26. Certification must be submitted to Council from all relevant service providers
which certifies that the development has met the requirements of this Decision
Notice and all applicable legislation at the time of construction.
Easements
27. Easements for inter-allotment drainage within Lots 26-28 which encompass the
constructed drainage structures.
28. Unless otherwise agreed in writing by the relevant service provider, any public
or third party infrastructure located on the subject site must be placed within an
easement registered against the title of the property.
29. All easements must be designed in accordance with the planning scheme and
granted at no cost to the Grantee. Where the Grantee is Council or a service
authority, the easement documentation must be in accordance with the
Grantee’s standard easement terms. Draft easement documentation must be
submitted to Council for endorsement.
30. All works must be kept clear of any existing or proposed easements on the
subject land, unless agreed otherwise in writing by the Grantee.
This is not an official copy of Council’s Minutes
Page 10 of 58
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.