Original source · versioned page text
2014-12-18 Ordinary Meeting Minutes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ORDINARY MEETING MINUTES 18 DECEMBER 2014
Water & Sewer Connections
8. An underground connection to reticulated water and sewerage must be
provided to each lot in accordance with the standards and requirements of
Northern SEQ Distributor–Retailer Authority (Unitywater).
9. A Certificate of Completion from the Northern SEQ Distributor–Retailer
Authority (Unitywater) must be submitted to Council that certifies an
underground connection to reticulated water and sewerage has been provided
to each lot.
Performance Bond
10. Security in the form of a cash bond or trading bank guarantee to the sum of
$10,000 must be submitted to Council, to secure performance of all conditions
of this approval, prior to the issue of a Development Permit for Operational
Works. The cash bond or trading bank guarantee will be returned on
performance of the conditions of approval less any costs incurred by Council in
respect of enforcing performance of this permit. Council reserves the right to
call upon the bond or guaranteed sum to effect compliance with conditions.
Landscaping & Ecology
11. Landscaping and rehabilitation works must be undertaken in accordance with
an Operational Works approval and Planning Scheme Policy - PSP 3
Landscaping Plants and Guidelines. An ecological rehabilitation and
landscaping plan must be submitted, prepared by a suitably qualified person*
and must include in particular:
a. the area to be rehabilitated and re-vegetated must be generally in
accordance with the approved Revegetation & Rehabilitation
Management Plan – Eastern Tributary Stage 5 & 6 and
b. details of the treatment to all batters, armoury, plantings, weed treatment,
location of services/utilities and rehabilitation.
c. a maintenance period of no less than 3 years
d. a species palette and densities table incorporating the species selection
of only native indigenous species
e. measurable and achievable criteria on which the performance of the
floristic and structural component of the re-vegetation strategy can be
assessed annually over three years, including no weeds at the end of the
re-vegetation period.
f. provision of 1 street tree with a minimum pot size of 100 litres planted
within the road reserve for every 8 metres of road frontage including
around the cul de sac
g. control of all weeds species listed in the following standards and
legislation:
i. declared plants under the Land Protection (Pest and Stock Route
Management) Act 2002 and sub-ordinate Regulation 2003
ii. Council Listed Environmental Weeds, Exotic Grasses and other
plants identified in writing by Council (*refer to Advisory Note)
12. All rehabilitation and re-vegetation of the eastern tributary (waterway) including
works within the Park and the construction of the footbridge must be completed
prior to Council endorsement of the Plan of Survey.
This is not an official copy of Council’s Minutes
Page 22 of 58
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.