Dedication of Land as Reserve
13. The area identified as lot 100 Park on the Approved Plans must be dedicated to
the Crown as a reserve for Park purposes. The land to be dedicated is “non-
trunk infrastructure” for the purposes of the Sustainable Planning Act 2009.
Works within Protected Land
14. The following works must be undertaken within the land to be dedicated to the
Crown as Park reserve:
a. footbridge and pathway
ENGINEERING
External Works
15. A new intersection must be constructed joining Cordwood Drive with the new
road (Masonry Street). The works must be undertaken in accordance with an
Operational Works approval, and must include in particular:
a. vehicle priority maintained to Cordwood Drive
b. provision of sight distances adequate for the design speed of the road
c. installation of street lighting
All works to be dedicated are “non-trunk infrastructure” for the purposes of the
Sustainable Planning Act 2009.
New Roads
16. The new road (Masonry Street) shown on the Approved Plans must be
constructed in accordance with the conditions of this Decision Notice and
dedicated as road reserve at no cost to Council. The works must be undertaken
in accordance with an Operational Works approval and must include in
particular:
a. a reserve width of 15 metres minimum widened where applicable to
encompass the cul-de-sac and the necessary verge areas
b. sealing, kerbing and channelling
c. An “Access Road” in accordance with Council’s Planning Scheme Policy
5 – Engineering Design Standards - Road, Drainage and Earthworks
d. construction of pedestrian footpaths in accordance with the conditions of
this Decision Notice
e. installation of street lighting
f. modifications to existing services
g. A cul-de-sac in accordance with Council’s Planning Scheme Policy 5 –
Engineering Design Standards - Road, Drainage and Earthworks.
All works to be dedicated are “non-trunk infrastructure” for the purposes of the
Sustainable Planning Act 2009.
Pedestrian and Bicycle Facilities
17. Pedestrian and bicycle facilities must be provided for the development. The
works must be undertaken in accordance with an Operational Works approval
and must include in particular:
a. a 2 metre wide footpath within the road verge on the western side of
“Masonry Street” extending to join with the existing pathway in Cordwood
Drive
This is not an official copy of Council’s Minutes
Page 23 of 58
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.