Original source · versioned page text
2014-12-18 Ordinary Meeting Minutes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ORDINARY MEETING MINUTES 18 DECEMBER 2014
a. the Disability Discrimination Act 1992 (Commonwealth);
b. the Anti-Discrimination Act 1991 (Queensland); and
c. the Disability (Access to Premises – Buildings) Standards.
Development Compliance Inspection
3. Prior to the commencement of the use, please contact Council's Development
Audit & Response Unit to arrange a Development Compliance Inspection.
Building and Construction Industry (Portable Long Service Leave) Levy
4. The QLeave levy must be paid prior to the issue of a development permit where
it is required. Council will not be able to issue a Decision Notice without receipt
of details that the Levy has been paid. QLeave contact: 1800 803 481 (free call)
or (07) 3212 6855.
Co-ordination of Operational Works Assessment
5. Additional application fees apply to Operational Work applications where the
different aspects of the works are lodged separately. Significant savings in
application fees will result if all works are lodged in a single application.
Preparation of a Preliminary Construction Management Plan
6. The works identified in this Decision Notice will be required to be carried out in
accordance with a Construction Management Plan endorsed by Council
through an approval for Operational Works. To ensure expedient assessment
of any Operational Works application, the applicant is advised to submit a
preliminary Construction Management Plan that addresses the requirements of
the planning scheme. In particular, the preliminary Construction Management
Plan should address the following:
a. provisions that ensure the proposed construction does not unduly impact
on the surrounding area and ensure the site is safe for members of the
public, implementing appropriate traffic signage in accordance with the
Manual of Uniform Traffic Control Devices (MUTCD) and making
provision for safe pedestrian access across the frontage of the site both
during daily construction and after daily construction has ceased.
Plumbing, Drainage, Waste Water Treatment and Disposal System
7. The establishment of Plumbing and Drainage and a waste water treatment and
disposal system for the site requires a Compliance Permit to be obtained from
Council under the Plumbing and Drainage Act 2002. The system must be
designed in accordance with the Queensland Plumbing and Wastewater Code,
Australian Standards AS/NZS3500, AS/NZS1547: 2000 “On-site Domestic
Wastewater Management”.
8. The existing Waste Water Treatment and Disposal System for the site is as
mentioned in the report from Barlow Shelley, Consulting Engineers, Section 8 ,
Reference number 1014 Dated 3rd September 2013, is capable of
accommodating the proposed changes to the development.
9. If design requirements for the site change, whereby the development exceeds
the accommodation or use of 21 or more equivalent persons, or generates a
requirement for an ERA63, then an Operator’s Licence from The Department of
Environment and Heritage Protection (DEHP) will also be required.
This is not an official copy of Council’s Minutes
Page 43 of 58
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.