Original source · versioned page text
2014-12-18 Ordinary Meeting Minutes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ORDINARY MEETING MINUTES 18 DECEMBER 2014
Description of procedures and clearly identified site responsibilities for all
site occupants for getting all waste to the bins; the storage of bins and the
collection of bins by the contractor.
A description of the design details of waste storage and recycling areas
including size, location, elevation and floor plan, methods of bin washing
and system to prevent storm water getting into the effluent system via the
bin wash.
A description of types and volume of waste storage containers to be
used, and the collection frequency of containers,
The waste and recycling storage area shall include the provision of
containers for all waste and recycling materials including putrescible
matter, non-recycling waste, paper/ cardboard, glass, aluminum/steel
cans, waste oil, Styrofoam boxes, etc.
Effluent Disposal
26. All factory wastewater and wash down waters shall be collected, treated and
disposed of lawfully on site in an approved effluent disposal system.
PLUMBING
Plumbing, Drainage and Waste Water Treatment and Disposal
27. The development must be provided with Plumbing, Drainage and an On-site
Waste Water Treatment and Effluent Disposal System having a capacity
sufficient for the use*.
*(Refer to Advisory Note)
Advisory Notes
PLANNING
Aboriginal Cultural Heritage Act 2003
1. There may be a requirement to establish a Cultural Heritage Management Plan
and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003
(ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A
person who carries out an activity must take all reasonable and practicable
measures to ensure the activity does not harm Aboriginal cultural heritage”. It is
an offence to fail to comply with the duty of care. Substantial monetary
penalties may apply to individuals or corporations breaching this duty of care.
Injunctions may also be issued by the Land and Resources Tribunal, and the
Minister administering the ACH Act can also issue stop orders for an activity
that is harming or is likely to harm Aboriginal cultural heritage or the cultural
heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Unit on 07 3247 6212 to discuss any
obligations under the ACH Act.
Equitable Access and Facilities
2. The plans for the proposed building work have NOT been assessed for
compliance with the requirements of the National Construction Code - Building
Code of Australia (Volume 1) as they relate to people with disabilities. Your
attention is also directed to the fact that in addition to the requirements of the
National Construction Code as they relate to people with disabilities, one or
more of the following may impact on the proposed building work:
This is not an official copy of Council’s Minutes
Page 42 of 58
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.