ORDINARY MEETING MINUTES 18 DECEMBER 2014
Temporary Development Approval
10. This temporary development approval expires in two (2) years on 18 December
2016. Upon request, Council may provide written consent to extend the
approval on an annual basis having regard to the status of the adjacent mining
lease, the degree of compliance with the approval conditions herein and the
complaint history relating to the development.
ENGINEERING
General
11. The developer must meet any costs to repair damage to any Council or public
asset during construction, where damage is a result of the development works.
Damage to assets must be repaired immediately where it creates a hazard to
the community. In circumstances where the damage does not create a hazard
to the community, it must be repaired immediately on completion of the works
associated with the development. A condition report including photographs of
the frontage of the site should be completed and kept for future reference and
made available to Council if required.
Driveway and Internal Roads
12. Sealed crossovers must be provided for the two accesses to the site in
compliance with the following:
a. IPWEAQ Standard Drawing SEQ R-056.
b. Designed and certified by a RPEQ
c. Have a minimum width of 4.0m at the property front boundary line.
13. Internal roads must:
a. Have a minimum width of 3.0m and widened where necessary to provide
passing opportunities for vehicles using the site.
b. Be all weather construction (sealed or compacted gravel) suitable for the
anticipated traffic and load of vehicles using the site.
c. Be provided with adequate stormwater drainage that prevents undue
erosion or surface deformation or settlement.
Excavation and Filling
14. All earthworks shall be undertaken in accordance with the provisions of AS
3798 “Guidelines on Earthworks for Commercial and Residential
Developments”.
Stormwater Drainage
15. Stormwater drainage works and water quality devices and measures must be
provided and maintained in accordance with the approved engineering plans
and in compliance with the Stormwater Quality Management Plan included in
the Stormwater Drainage for No 154 Holts Rd Cooroy Report dated 26
September 2014, Ref No: 1432 IWMP.doc, prepared by Callaghan & Toth.
Particular attention must be given to the construction and maintenance regime
of the two proposed Sediment Basins. The drainage works and basins must be
certified by an RPEQ on completion.
16. Stormwater runoff from the development must be disposed of on-site without
causing scour or damage to the subject site, the dam or any adjoining property.
This is not an official copy of Council’s Minutes
Page 51 of 58