Original source · versioned page text
2014-12-18 Ordinary Meeting Minutes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ORDINARY MEETING MINUTES 18 DECEMBER 2014
e. installation of street lighting
f. modifications to existing services
g. cul-de-sacs in accordance with Council’s Planning Scheme Policy 5 –
Engineering Design Standards - Road, Drainage and Earthworks
h. bollards or similar approved barriers on the western side of the new road
that prevent vehicles from entering into the proposed bio-swale and park
i. flood immunity in accordance with QUDM
All works to be dedicated are “non-trunk infrastructure” for the purposes of the
Sustainable Planning Act 2009.
Pedestrian and Bicycle Facilities
19. Pedestrian and bicycle facilities must be provided for the development. The
works must be undertaken in accordance with an Operational Works approval
and must include in particular:
a. a 2 metre wide footpath within the road verge on the eastern side of the
new road extending to join with the existing pathway in Blue Wren Place
b. pram ramps on both sides of Blue Wren Place at the intersection with the
new road
c. a 2 metre wide footpath within proposed Lot 100 extending to the
pathway and footbridge as shown on plan number 1225-62A dated 9/14
prepared by Callaghan and Toth
d. a 2 metre wide footpath within the new road (between lots 25 & 26) and
proposed Lot 100 connecting the cul-de-sac of the new road to the
existing pathway network in Lake Macdonald Drive.
All pedestrian and bicycle facilities to be dedicated are “non-trunk infrastructure”
for the purposes of the Sustainable Planning Act 2009.
Stormwater Drainage.
20. The site must be provided with a stormwater drainage system connecting to a
lawful point of discharge. The works must be undertaken in accordance with an
Operational Works approval, and must include in particular:
a. the drainage structures generally as shown on the Approved Plans
b. the provision of Level 2 inter-allotment drainage for proposed Lots 26-28
including registration of drainage easements
c. provision of kerb adapters for all new lots that discharge into the new road
d. extension of the site stormwater system to accommodate stormwater
from applicable areas external to the site, including registration of
drainage easements
e. a maintenance path to any proposed bioretention basin that is suitable for
Council’s maintenance vehicles
21. A stormwater quality treatment system must be provided for the development.
The works must be undertaken in accordance with an Operational Works
approval and the Bioretention Technical Design Guidelines (Water by Design)
and must include in particular:
a. stormwater quality treatment devices generally in accordance with the
Approved Plans
This is not an official copy of Council’s Minutes
Page 9 of 58
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.