Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

Minor Change Existing Approval - MCU23 0109.01, OPW23 0123.01 & RAL23 0017.01 (As Published)

of 21

Page text shows just the words. Original shows the document exactly as it was published.

               93.    All works must be constructed and work procedure undertaken in accordance with:
                      a.      The approved plans/documents and conditions detailed in this Decision Notice.
                      b.      The relevant conditions of the higher order Material Change of Use approval viz. Insert
                              MCU23/0109 to which this approval relates.
                      c.      All relevant Council Planning Scheme Policies, standard drawings, standard
                              specifications and guidelines.
                      d.      The latest version of Water Sensitive Urban Design Technical Design Guidelines for
                              South East Queensland (Healthy Waterways) for all water quality devices to be
                              constructed on site.
                      Vegetation Clearing
               94.    Prior to felling or pruning, all trees are to be checked for wildlife (i.e. koalas, possums, birds
                      etc.) If wildlife is present, the tree vegetation must not be felled or pruned until the wildlife
                      has left vegetation or has been relocated by a qualified fauna spotter catcher.
                      *(Refer to Advisory Note)
               95.    All tree and vegetation removal works must be undertaken by a qualified person*.
                      *(Refer to Advisory Note)
                      Landscaping Works
               96.    Landscape works must be supervised, undertaken and certified by qualified persons*. All
                      works must be completed in accordance with this Decision Notice.
                      (* Refer to Advisory Note)
               97.    Where damage occurs to any Council asset as a result of the development works, it must be
                      repaired immediately where it creates a hazard that presents risk to person or property. Other
                      damage must be repaired prior to completion of works.
               98.    Street trees must:
                      a.      Meet AS2303 Tree stock for landscape use.
                      b.      Be located in accordance with engineering requirements for safe vehicle and
                              pedestrian sight lines.
                      FOLLOWING CONSTRUCTION
                      Supervision/Certification
               99.    Prior to commencement of use the following (prepared by respective qualified persons* and
                      certifying compliance with approvals) must be submitted to Council:
                      a.      Landscaping certification confirming all works have been constructed in accordance
                              with conditions of approval.
                      b.      NATSPEC certification (Specifying Trees: a guide to assessment of tree quality
                              addressing each specimen).
                      (* Refer to Advisory Note)
               5.     REFERRAL AGENCIES

               Not Applicable.




                                                                                                        Page 16 of 21
Document Set ID: 24258311
Version: 5, Version Date: 30/10/2025
Log in to download the original file

Minor Change Existing Approval - MCU23 0109.01, OPW23 0123.01 & RAL23 0017.01 (As Published).pdf · 214 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.