Minor Change Existing Approval - MCU23 0109.01, OPW23 0123.01 & RAL23 0017.01 (As Published)
22. All clauses and by-laws of the proposed Community Management Statement must accord
with the requirements of this Decision Notice and, in particular, must include the following
additional clauses:
a. The dwelling units are not permitted to be used for short term accommodation, unless
where identified as accepted development by the Noosa Plan or where there is a
Development Permit for Material Change of Use for Short Term Accommodation in
effect. Short term accommodation means the use of the premises for providing
accommodation of less than 3 consecutive months to tourists or travellers.
ENGINEERING
External Works
23. Kauri Street must be upgraded for the length of its frontage to the subject site. The works
must be undertaken in accordance with the conditions of this approval and Operational
Works approval OPW23/0123, be generally in accordance with SCG Consulting’s Driveway
& Access Plan (OW4.1, Rev. B) dated 7 March 2024 and must include in particular:
a. construction of a transitional pedestrian footpath in accordance with the conditions of
this Decision Notice; and
b. removal of the existing property access and reinstatement of the kerb, footpath and
verge area to match the balance of the site frontage, including the provision of topsoil
and turf where the existing verge is grassed.
Site Access and Driveways
24. A sealed access driveway must be provided from Kauri Street to all parking and manoeuvring
areas of the development. The works must be undertaken in accordance with the conditions
of this approval and Operational Works approval OPW23/0123, and be generally in
accordance with SCG Consulting’s Driveway & Access Plan (OW4.1, Rev. B) dated 7 March
2024 and Driveway Details (OW4.3) dated June 2023 and must include in particular:
a. a driveway crossover in accordance with Council’s standard drawing RS-051.
Car Parking
25. A minimum of ten (10) covered and two (2) uncovered car parking spaces and either an
additional uncovered carpark space or four (4) motorbike spaces must be provided and
marked on the site. The works must be undertaken in accordance with the conditions of this
approval and Operational Works approval OPW23/0123, be generally in accordance with
SCG Consulting’s Driveway & Access Plan (OW4.1, Rev. B) dated 7 March 2024 and must
include in particular:
a. Three visitor spaces or two visitor car parking and four motorbike spaces within the
total, which are clearly marked for that purpose and accessible at all times for visitor
use; and
b. dimensions, crossfalls and gradients in accordance with Australian Standard AS2890:
Parking Facilities.
Pedestrian and Bicycle Facilities
26. Pedestrian and bicycle facilities must be provided for the development. The works must be
undertaken in accordance with the conditions of this approval and Operational Works
approval OPW23/0123, be generally in accordance with SCG Consulting’s Driveway &
Access Plan (OW4.1, Rev. B) dated 7 March 2024 and must include in particular:
a. a transitional concrete footpath adjacent to each side driveway crossover.
Stormwater Drainage
27. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge. The works must be undertaken in accordance with the conditions of this approval
and Operational Works approval OPW23/0123, be generally in accordance with SCG
Consulting’s Stormwater Management Plan (SW1.1, Rev. B) dated 7 March 2024.
Page 5 of 21
Document Set ID: 24258311
Version: 5, Version Date: 30/10/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original