Minor Change Existing Approval - MCU23 0109.01, OPW23 0123.01 & RAL23 0017.01 (As Published)
Plumbing and Drainage
39. (l) It is a requirement of the ‘Standard Plumbing and Drainage Regulation 2019’ that at
demolition of a building, the existing sanitary drain upstream from the connection point for a
service provider’s sewerage system must be sealed water tight. This work is deemed as
notifiable Work and must be carried out by a suitably licenced plumber who must submit an
As Constructed plan and Form 4 (Notifiable Works Form) to the QBCC (Queensland Building
Construction Commission) within 10 days of completing the work.
RAL23/0017 - RECONFIGURING A LOT (COMMUNITY TITLE)
When Conditions Must Be Complied With
40. Unless otherwise stated, all works required by the conditions of this Decision must be
completed prior to submission of the subdivision plan to Council for compliance assessment.
Currency Period
41. This development approval lapses if the requirements of the conditions have not been
completed and an application for plan seal is not lodged with Council by 14 May 2030, unless
an application to extend the currency period is approved by Council.
Approved Plans
Development authorised by this approval must be undertaken generally in accordance with
the Approved Plans listed in the tables below.
Plan No. Rev. Plan/Document Name Date
202304 DA.05 A Property Plan prepared by Black Wood 08.08.2023
42. All lot numbering on the subdivision plan to be submitted to Council for compliance
assessment must remain as shown on the Approved Plans.
Water & Sewer Connections
43. An underground connection to reticulated water and sewerage must be provided to each lot
in accordance with the standards and requirements of Northern SEQ Distributor–Retailer
Authority (Unitywater).
A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority (Unitywater)
must be submitted to Council that certifies an underground connection to reticulated water
and sewerage has been provided to each lot.
Services
44. Underground reticulated electricity and telecommunication services must be provided to
each lot in accordance with an approval for Operational Works and the standards and
requirements of the relevant service provider.
45. Unless otherwise stipulated by telecommunications legislation at the time of construction, the
development must be provided with all necessary conduits, pits and pipes to accommodate
the future connection of optic fibre technology telecommunications.
46. Certification must be submitted to Council from all relevant service providers (Energex, NBN)
which certifies that the development has met the requirements of this Decision Notice and
all applicable legislation at the time of construction.
Community Management Statement
47. Any proposed Community Management Statement required for the development pursuant to
the Body Corporate and Community Management Act 1997 must be submitted to Council for
endorsement at the same time as submission of the subdivision plan to Council for
compliance assessment.
Page 8 of 21
Document Set ID: 24258311
Version: 5, Version Date: 30/10/2025