Original source · versioned page text
Minor Change Existing Approval - MCU23 0109.01, OPW23 0123.01 & RAL23 0017.01 (As Published)
Additional Conditions – 29 October 2025
DEMOLITION WORKS
Codes of Development
39. (a) Unless specifically conditioned otherwise, all works must comply with the relevant
acceptable solutions as contained in the Waste Management Code and Water Quality and
Drainage Code of the Noosa Plan 2020.
Works
39. (b) Demolition must be undertaken in a manner that causes no detrimental effect upon the
amenity of the neighbourhood by reason of the creation of excessive noise, lighting, air-
borne hazards, atmospheric pollutants (including dust or odours) nuisance or any other
emissions in accordance with the nuisance provisions of the Environmental Protection Act
1994.
Waste Management
39. (c) Adequate area must be provided on-site for the collection and separate storage of
recyclable, non-recyclable, vegetative and hazardous materials in their specific waste
streams during removal or demolition works.
39. (d) All waste materials must be removed from the site to avoid causing unhealthy conditions,
with the site left clean, tidy and free from any debris.
39. (e) Where a development permit has not been issued for the future use of the site, hard
surfaced areas including concrete slabs must be removed and disturbed areas must be
revegetated in accordance with PSP2 Landscaping of the Noosa Plan 2020. Alternatively,
the site must be turfed within 20 business days of completing the removal or demolition
work.
Health and Safety
39. (f) All building materials containing asbestos, including asbestos cement sheeting or roofing
and lagging, are removed from the building prior to demolition or relocation.
39. (g) Removal of building materials containing asbestos must be undertaken by a licensed
asbestos removalist.
39. (h) Asbestos removal work (Section 466) of the Work Health and Safety Regulation 2011
requires a licensed asbestos removalist to give notice to Workplace Health and Safety
Queensland (WHSQ) of licensed asbestos removal work at least five days before the work
commences. Notification must be made using Form 65: Notification of licensed asbestos
removal work, demolition work or emergency demolition.
39. (i) All building materials containing asbestos products are wrapped and disposed of in
accordance with the Public Health Regulation 2006 and the Environmental Protection
Regulation 2008 Note: Asbestos is a Regulated Waste. The Department of Environment &
Science licenses businesses that transport asbestos waste, and landfills that accept this
waste.
General
39. (j) Infrastructure including reticulated water, sewerage, stormwater, and electricity must be
protected from damage and made safe to the standard required by the regulatory authority.
39. (k) Any damage to footpaths, street plantings, natural vegetation/trees, kerb and channel,
bridges or roadways at the removal/demolition site must be repaired or reinstated to at least
pre-existing conditions.
Page 7 of 21
Document Set ID: 24258311
Version: 5, Version Date: 30/10/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original