Skip to the record
For the highest quality transcripts.

Original source · versioned page text

2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 4 (Pages 916-937)

of 22

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

        SCHEDULE 2—EROSION AND SEDIMENT CONTROL




                                                                                                              Including amendments to 3 July 2017
                     ASSESSMENT




                                                                                                  The Noosa Plan
Preamble
Erosion and sediment control on building sites

Builders must not pollute the environment. The Environmental Protection Act provides for
penalties for persons or entities causing environmental harm.

Soil erosion on building sites can be a major source of sediment pollution (environmental
harm) in our watercourses. A single building site can lose up to four truckloads of soil in one
storm. Washed from the sites into stormwater drains, this sediment can cause flooding and
also affects the water quality and the fish stocks in our creeks, lakes and the Noosa River
system.

Preventing sediment run-off from building sites is one of a number of ways that Council and
industry are improving our watercourses.

Effective on-site erosion and sediment control provides the following benefits—


      A better looking, more marketable site;

      Improved wet weather working conditions;

      Reduced stockpile losses;
      Less mud and dust problems;

      Reduced clean-up costs;

      Fewer public complaints;

      Better public image;

      Cleaner watercourses; and

      Better fishing and swimming in our nearby watercourses.

1.            Erosion Hazard Assessment Form
Controlling Factors                                                   Points   Score   Checking
                      1
Predominant slope of the whole site, prior to
building works:
 0 - 3% slope                                                           0
 >3% - 5% slope                                                         1
 >5% - 10% slope                                                        2
 >10% - 15% slope                                                       4
 > 15% slope                                                            5
Soil type: (see 1 below)
 Sandy soil/gravel                                                      0
 Sandy loam                                                             1
 Clay loam                                                              2

1
    The term ‘predominant slope’ is defined in Part 2 Section 2.12.



                                                              S2.1
Log in to download the original file

2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 4 (Pages 916-937)(PDF, 5MB).pdf · 4.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.