Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 4 (Pages 916-937)

of 22

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                                                  Controlling Factors                                                 Points         Score         Checking
                                                   Clay soil                                                             2
            Including amendments to 3 July 2017




                                                  Anticipated duration of site disturbance: (see 2 below)
The Noosa Plan




                                                   Duration < 2 weeks                                                      0
                                                   2 weeks  Duration < 3 months                                           2
                                                   3 months  Duration < 6 months                                          4
                                                   Duration > 6 months                                                     5
                                                  Month that works are undertaken: (see 3 below)
                                                   August, September                                                       0
                                                   April, May, June, July, November, October                               1
                                                   March December                                                          2
                                                   January February                                                        3
                                                  Offsite sediment control (i.e. down slope of the soil
                                                  disturbance):
                                                   Score 1 point if there is no purpose built, operational                 1
                                                      and well maintained sediment traps (eg. sediment
                                                      basin, gross pollutant trap or purpose built wetland)
                                                      to catch sediment before it enters a water body with
                                                      environmental values (eg. creek, natural wetland,
                                                      river or bay) (see 4 below)
                                                  Run-off entering the site:
                                                   Score 1 point if stormwater run off entering the site is                1
                                                      not diverted away from the soil disturbance
                                                  Extent of site disturbance:
                                                   Score 2 points if building work requires reshaping of
                                                      the ground surface (eg. ‘cut and fill’ works) (see 5                  2
                                                      below)
                                                    Score 5 points if the area to be disturbed is greater                  5
                                                     than 600m²
                                                  Works within environmentally sensitive areas:
                                                   Score 11 points if the disturbance is within the banks
                                                     of a watercourse (see 6 below)                                        11
                                                   Score 5 points if the disturbance is within 50m of the
                                                     top of bank of a watercourse                                           5
                                                   Score 2 points if the disturbance is between 50m
                                                     and 100m of the top of bank of a watercourse                           2

                                                  TOTAL SCORE (See 7 & 8 below)
                                                  Notes:
                                                      1. Where there is more than one type of soil on the site, select the category with the highest point value.
                                                      2. The time, from when the building site will first become vulnerable to erosion, to the time the soil will
                                                         be fully stabilised (eg. grassing).
                                                      3. If this time span covers more than one category, select the category with the highest point value.
                                                         Note that if there is no grass/vegetation cover on the site before building work has started, the time
                                                         span starts from the time this form is completed.
                                                      4. If you are not sure, score 1 point.
                                                      5. For the purpose of this form, ‘cut and fill’ works are those that will result in a steep batter or retaining
                                                         wall above and/or below the building slab, greater than 1 metre in height. If the building slab has
                                                         already been fully cut and stabilised (eg. grassed) during the subdivision stage, score 0 points.
                                                      6. Watercourse means any clearly identifiable creek, stream or river, whether flowing permanently or
                                                         intermittently.
                                                      7. For a high risk site, the total score is  14 points.
                                                      8. For a low risk site, the total score is < 14 points.




                                                                                                           S2.2
Log in to download the original file

2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 4 (Pages 916-937)(PDF, 5MB).pdf · 4.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.