Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 4 (Pages 916-937)

of 22

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

 SCHEDULE 8—DEMOLITION & CONSTRUCTION WASTE




                                                                                                                      Including amendments to 3 July 2017
                                                                                                     The Noosa Plan
               MANAGEMENT

Preamble
Council is committed to the principle of waste minimisation and re-use of construction
materials or whole buildings within the Shire. To achieve this Council requires the submission
of Waste Management Plans for the construction and demolition of specified development.

The purpose of submission of Waste Management Plans is to encourage the segregation of
waste so that the materials can be recycled or re-used within Council’s Waste Management
processes, and any hazardous materials are disposed of appropriately.

Council has developed a fee structure at its waste facilities, which rewards contractors who
segregate building and construction waste by charging low fees for segregated material.
Much higher fees apply to unsegregated waste.

The Waste Management Plan for either the Construction Stage or Demolition Stage of a
development shall contain the following information:

MATERIALS ON SITE             DESTINATION

                                              Re-use and Recycling                    Disposal

Expected Type of Waste        Estimated       On-site              Off-site
                                        3
Material                      volume (m )
                                              specify proposed     specify            specify
                                              re-use or on-site    contractor and     contractor
                                              recycling            recycling outlet   and landfill
                                              methods.                                site

Asbestos

Excavation material

Garden Organics

Bricks

Concrete

Timber - please specify

Plasterboard

Metals - please specify

Other - please specify


Note: Details of site area to be used for onsite separation, treatment and storage (including
weather protection) should be provided on the plan drawings accompanying your application.




                                               S8.1
Log in to download the original file

2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 4 (Pages 916-937)(PDF, 5MB).pdf · 4.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.