Original source · versioned page text
2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 4 (Pages 916-937)
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
The key to implementation of a successful Waste Management Plan is to allocate an area on the
development site for segregation of building and construction materials. The segregated materials
Including amendments to 3 July 2017
can then be transported to the waste facility either by the contractor’s own vehicle or via skip bins
The Noosa Plan
from a Waste Contractor. Segregation of building and construction waste reduces disposal costs
and assists the community in achievement of a sustainable environment.
S8.2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.