SPL-0514-009997.1 - s271 Amended Concurrence agency response before application is made (with conditions) · OPW14/0239

Attached to the e-mail OPW14/0239 Amended DSDIP Concurrence Agency Response.

of 8

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Our reference:
Your reference:

SPL-0514-009997/1
11363

Attachment 1—Conditions to be imposed

SPL-0514-009997/1

 

No.

 

Conditions

 

Condition timing

 

Development Permit for Operational Works — Prescribed Tidal Works (Pontoon and
walkway)

 

Schedule 7, Table 2, tem 15, Maritime Safety matters - Pursuant to section 255D of the
Sustainable Planning Act 2009, the chief executive administering the Sustainable
Planning Act 2009 nominates the Director-General of the Department of Transport and
Main Roads (Maritime Safety Queensland) to be the assessing authority for the
development to which this development approval relates for the administration and
enforcement of any matter relating to the following conditions:

 

1.

The applicant must supply the Regional Harbour Master
with completed “As Constructed” drawings.

The required information is to be forwarded to:
Regional Harbour Master

Maritime Safety Queensland

Macarthur Avenue East

Pinkenba, Qld , 4008

Within two weeks
of the completion of
the works.

 

 

 

 

 

2. Development must be carried out generally in accordance Upon the
with the following plans, except as modified by these completion of
concurrence agency conditions: works and to be
e Title: Site plan, elevation & general notes, Author: maintained at all
Superior Jetties, Plan: 11363 - D01, Date: times
28/08/2014, Revision A.
3. Any ship, dry berth or device (including Air Lifting Pontoons) | At all times
berthed, moored or attached to the pontoon/structure must
not exceed the following sizes:
e Wet berth - length overall: 8.0m; beam: 2.6m
« Maximum Vessel Mass — 3,000 Kg
4. No part of any structure or any ship berthed at the approved | At all times
structure is to encroach within 1.5metres from the side
boundaries of the allocated water space as shown on the
water allocation plan NQ - 01.
5. The applicant must notify the Regional Harbour Master in Notification to be

 

writing of the commencement and completion of the
approved works.

The required information is to be forwarded to:
Regional Harbour Master

Maritime Safety Queensland

Macarthur Avenue East

Pinkenba, Qld , 4008

 

given at least two
weeks prior to the
commencement of
the works and
within two weeks
after the
completion of the

 

Department of State Development, Infrastructure and Planning

Page 4

 

Used in these records

About this file

File size
1.1 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SPL-0514-009997.1 - s271 Amended Concurrence agency response before application is made (with conditions).pdf · 1.1 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.