Council archive · source document
SPL-0514-009997.1 - s271 Amended Concurrence agency response before application is made (with conditions) · OPW14/0239
Attached to the e-mail OPW14/0239 Amended DSDIP Concurrence Agency Response.
Our reference: Your reference: SPL-0514-009997/1 11363 Attachment 1—Conditions to be imposed SPL-0514-009997/1 No. Conditions Condition timing Development Permit for Operational Works — Prescribed Tidal Works (Pontoon and walkway) Schedule 7, Table 2, tem 15, Maritime Safety matters - Pursuant to section 255D of the Sustainable Planning Act 2009, the chief executive administering the Sustainable Planning Act 2009 nominates the Director-General of the Department of Transport and Main Roads (Maritime Safety Queensland) to be the assessing authority for the development to which this development approval relates for the administration and enforcement of any matter relating to the following conditions: 1. The applicant must supply the Regional Harbour Master with completed “As Constructed” drawings. The required information is to be forwarded to: Regional Harbour Master Maritime Safety Queensland Macarthur Avenue East Pinkenba, Qld , 4008 Within two weeks of the completion of the works. 2. Development must be carried out generally in accordance Upon the with the following plans, except as modified by these completion of concurrence agency conditions: works and to be e Title: Site plan, elevation & general notes, Author: maintained at all Superior Jetties, Plan: 11363 - D01, Date: times 28/08/2014, Revision A. 3. Any ship, dry berth or device (including Air Lifting Pontoons) | At all times berthed, moored or attached to the pontoon/structure must not exceed the following sizes: e Wet berth - length overall: 8.0m; beam: 2.6m « Maximum Vessel Mass — 3,000 Kg 4. No part of any structure or any ship berthed at the approved | At all times structure is to encroach within 1.5metres from the side boundaries of the allocated water space as shown on the water allocation plan NQ - 01. 5. The applicant must notify the Regional Harbour Master in Notification to be writing of the commencement and completion of the approved works. The required information is to be forwarded to: Regional Harbour Master Maritime Safety Queensland Macarthur Avenue East Pinkenba, Qld , 4008 given at least two weeks prior to the commencement of the works and within two weeks after the completion of the Department of State Development, Infrastructure and Planning Page 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SPL-0514-009997.1 - s271 Amended Concurrence agency response before application is made (with conditions).pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.1 MB (small file)
- File type
No other editions are linked here.