Council archive · source document
SPL-0514-009997.1 - s271 Amended Concurrence agency response before application is made (with conditions) · OPW14/0239
Attached to the e-mail OPW14/0239 Amended DSDIP Concurrence Agency Response.
SPL-0514-009997/1 No. Conditions Condition timing works. The structure must be adequately lit and all lighting must be positioned so that it does not cause a risk to the safe navigation of other ships. Any freestanding piles must have retro-reflective tape fitted. Lighting must be provided in accordance with Maritime Safety Queensland’s requirements and section 3 of AS 4282-1997 ‘Control of the obtrusive effects of outdoor lighting’. At all times The pontoon must be constructed totally within the approved quayline. At all times The construction, operation or maintenance of the structure must not impede the safe navigation of other ships or restrict safe access to or from neighbouring structures. At all times The applicant must dispose of any obstructions and debris encountered while undertaking the works. This work is to be undertaken at no expense to the Department of Transport and Main Roads and in accordance with any directions issued by the Regional Harbour Master. At all times during construction 10. Any ship moored at this pontoon/jetty must not impede the safe navigation of other ships or restrict access to or from neighbouring structures. At all times Department of State Development, Infrastructure and Planning Page 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SPL-0514-009997.1 - s271 Amended Concurrence agency response before application is made (with conditions).pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.1 MB (small file)
- File type
No other editions are linked here.