Skip to the record
Beware of cheap imitations.

Council archive · source document

SPL-0514-009997.1 - s271 Amended Concurrence agency response before application is made (with conditions) · OPW14/0239

Attached to the e-mail OPW14/0239 Amended DSDIP Concurrence Agency Response.

of 8

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

SPL-0514-009997/1

Our reference: SPL-0514-009997/1
Your reference: 11363

Attachment 2—Reasons for decision to impose conditions

The reasons for this decision are:

e The Department of Transport and Main Roads through Maritime Safety
Queensland has the responsibility to ensure that any ship, dry berth or device
(including Air Lifting Pontoons) berthed, moored or attached to the
pontoon/structure do not impede navigational safety

e The Department of Transport and Main Roads through Maritime Safety
Queensland is responsible for ensuring that the construction, operation or
maintenance of the approved structure will not adversely impact on navigational
safety.

e If the pontoon is implemented as proposed and in accordance with these
conditions, it will not impede navigational safety.

Findings on material questions of fact

e The proposed pontoon does not extend beyond the established quayline or
neighbouring structures.

« Asship up to the maximum size specified can be berthed at this pontoon without
impeding navigational safety.

e Obstruction and debris uncovered or otherwise encountered during the
construction of the approved structure has the potential to interfere with
navigational safety.

e Maritime Safety Queensland needs to maintain the as constructed details of all
structures located within navigable waterways.

Evidence or other material on which the findings were based

e Plan prepared by Superior Jetties,
o Title: Site plan, elevation & general notes
o Reference No: 11363-D01
o Dated 28/08/14
o RevisionA
e Transport Operations (Marine Safety) Act 1994
e State Development Assessment Provisions published by the Department of State
Development, Infrastructure and Planning
e Sustainable Planning Act 2009

e Sustainable Planning Regulation 2009

Department of State Development, Infrastructure and Planning Page 6

Used in these records

About this file

File size
1.1 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SPL-0514-009997.1 - s271 Amended Concurrence agency response before application is made (with conditions).pdf · 1.1 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.