Original source · versioned page text
2017-01-16 General Committee Meeting Notes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING 16 JANUARY 2017
DA-02 P5 Site Plan, prepared by Red Dog Architects 19/10/2016
DA-05 P5 North Elevation, prepared by Red Dog Architects 19/10/2016
DA-06 P5 South Elevation, prepared by Red Dog Architects 19/10/2016
DA-07 P5 East & West Elevations, prepared by Red Dog 19/10/2016
Architects
3. The Approved Plans must be amended to incorporate the amendments listed
within this Decision Notice and resubmitted to Council prior to the issue of
Development Permit for Operational Works for any civil works.
Built form
4. The building design must be amended to include architectural design features
that reflect the hinterland/village character of the locality. Design outcomes such
as traditional roof form, timber framed windows, eaves and the like must be
included.
5. The development must include a tourist kiosk which includes but is not limited to
an interpretive map promoting the opportunities in Cooroy, Pomona, Cooran and
Kin Kin localities, the Noosa Country Drive and Recreational Vehicle Stop over
locations. The kiosk must have a minimum floor area of 10m². The content and
design of the kiosk must be submitted to Council prior to the issue of an
operational works approval for any civil works.
Nature and Extent of Approved Use
6. The approved Gross Floor Area of the Service Station and Convenience Shop is
195m².
7. The approved Use Area of the Entertainment and Dining Business is 255m²
including the outdoor dining area.
8. The development may operate 24 hours.
9. The development must include an electric charge station.
Building Height
10. The maximum height of the development must not exceed 8 metres above the
finished ground level and the natural ground level.
11. Certification must be submitted to Council from a Licensed Surveyor which
certifies that the buildings do not exceed the maximum height requirement of this
Decision Notice.
Performance Bond
12. Security in the form of a cash bond or trading bank guarantee to the sum of
$15,000 must be submitted to Council, to secure performance of all conditions of
this approval, prior to the issue of a Development Permit for Operational Works
for any civil works (or landscaping). The cash bond or trading bank guarantee
will be returned on performance of the conditions of approval less any costs
incurred by Council in respect of enforcing performance of this permit. Council
reserves the right to call upon the bond or guaranteed sum to effect compliance
with conditions.
Page 14 of 52
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.