2017-01-16 General Committee Meeting Notes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING 16 JANUARY 2017
Landscaping
13. The development must be landscaped generally in accordance with the approved
site plan, Planning Scheme Policy PSP3 - Landscaping Plants and Guidelines
and an Operational Works approval and must include in particular:
a. the 5m wide garden and associated larger corner gardens along the Holts
Road frontage must be densely landscaped with suitable low to medium
height plantings
b. the 5m wide garden along the northern and western boundaries must be
densely landscaped to help mitigate light emanating from the site at night.
The planted vegetation must have a minimum pot size of 45 litres and
consist of native, endemic species with a mature height of not less than 10
metres and a maximum spacing of 4 metre centres.
c. five (5) x 45 litre street trees evenly spaced in the Taylor Court road reserve
fronting the site.
Earthworks
14. All earthworks, associated batters and retaining walls must be undertaken in
accordance with an Operational Works approval, and must in particular:
a. be carried out in accordance with a site-specific Geotechnical Investigation
Report prepared by a suitably qualified person*
b. be undertaken in compliance with the provisions of Australian Standard
AS3798: Guidelines on Earthworks for Commercial and Residential
Developments
c. all fill and associated batters must be contained entirely within the subject
site unless written permission from the respective landowner(s) is provided
to Council.
15. All Earthworks and construction works must be carried out taking into
consideration the protection of any existing above and below surface services,
and the stability and protection of fences and any buildings and structures on the
adjoining properties.
Site Access and Driveways
16. Sealed access driveways must be provided from Taylor Court to all parking and
manoeuvring areas of the development generally in accordance with the
approved plans. The works must be undertaken in compliance with an
Operational Works approval and must include in particular:
a. a driveway crossover generally in accordance with the approved plans and
standard drawing SEQ R-051 with a width not exceeding 9.0m at the
boundary line
b. traffic restriction signage to identify Exit Only and Entry Only requirement
in accordance with approved plans
c. grades and configuration that demonstrate smooth maneuvering and
adequate ground clearance (no bottoming down) for for all vehicles and
particularly for fuel tankers, articulated vehicles, heavy rigid vehicles along
the vehicles traveling paths
d. finished levels and grades to match the existing concrete pathway along
the frontage of the site
Page 15 of 52