Original source · versioned page text
2017-01-16 General Committee Meeting Notes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING 16 JANUARY 2017
State Planning Environmental Approved Plan of
Policy Protection Water Development
Policy Water Water Quality
Quality Objectives Criteria
Total 90% reduction <6mg/L 90th%ile 15mg/L
Suspended compared to an
Solids unmitigated
development
Total 60% reduction Maximum 50ug/L Maximum 0.03mg/L
Phosphorous compared to an
unmitigated
development
Total 45% reduction Maximum 500 ug/L Maximum 0.3mg/L
Nitrogen compared to an
unmitigated
development
f. The development must include bins with educational signage material to
encourage patrons who purchase items that generate gross pollutants to
dispose of such items appropriately, and not where they may enter
stormwater systems.
g. Stormwater quality treatment devices must be routinely checked, serviced
and cleaned in accordance with the manufacturer’s recommendations or
Water by Design maintaining vegetated stormwater assets guidelines.
Records of all maintenance activities undertaken must be kept and made
available to Council upon request. Where replacement cartridges or other
necessary components for the system become unavailable, an alternative
system is required to be retrofitted into the development to achieve an
equivalent pollutant reduction outcome.
h. All primary stormwater quality treatment devices must be routinely
checked, serviced and cleaned in accordance with the manufacturer’s
recommendations. Records of all maintenance activities undertaken must
be kept for 5 years and made available to Council upon request.
i. The ongoing maintenance plan for the development must include the
operations and maintenance manual for the water quality device/s and
must include the full cost of maintaining the system. This maintenance plan
must be provided as part of the subsequent operational works
j. The development must not cause an increase in peak flow runoff in 1, 5,
50 or 100 ARI events. The subsequent application for operational works
must include calculations and designs to demonstrate how this condition is
achieved.
Page 18 of 52
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.