GENERAL COMMITTEE MEETING 16 JANUARY 2017
b. any required pedestrian refuge areas within the carpark to ensure safe and
convenient pedestrians movements within the site.
c. a total of 9 bicycle parking spaces and 5 end of trip lockers.
Electricity and Telecommunication Services
23. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits
and pipes to accommodate the future connection of optic fibre technology
telecommunications.
24. Any requirement by a service provider to alter, upgrade or encase an existing
service within the work site must be carried out at the applicant’s expense.
25. Certification must be submitted to Council from all relevant service providers
which certifies that the development has met the requirements of this Decision
Notice and all applicable legislation at the time of construction.
Damage to Services and Assets
26. Any damage caused to existing services and assets above or below the ground
must be repaired:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the
development.
Any repair work which proposes to alter the alignment or level of existing
services and assets must first be referred to the relevant service authority
for approval.
Stormwater Drainage
27. The site must be provided with a stormwater drainage system connecting to a
lawful point of discharge. The works must be undertaken in accordance with an
Operational Works approval and the Queensland Urban Drainage Manual, and
must include in particular:
a. No adverse impact on other properties and the road’s footpath and grassed
verge (e.g. by diverting flows and/or blocking flows and causing additional
ponding)
b. The use of gravity stormwater drainage only and not surcharge pits or
pumps.
c. collection and discharge of stormwater to Taylor Court.
d. A stormwater detention system to manage peak flows for all storms up to
and including 1 in 100 years storm event
e. A stormwater quality treatment system. The stormwater treatment must
generally be in accordance with the Stormwater Management Plan For
Highway Service Centre Cooroy, project number 161968 by Covey
Associates, dated October 2016 except where alteration to impervious area
and water quality treatment dimensions are necessary to achieve the
following objectives as predicted in MUSIC modelling in accordance with
the Water by Design MUSIC modelling guidelines.
Page 17 of 52