2017-01-16 General Committee Meeting Notes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING 16 JANUARY 2017
External Works Frontage Reinstatement Works
21. Frontage and external works be undertaken in accordance with an Operational
Works approval and must include in particular:
a. an extension to the existing concrete footpath to a new pram ramp facing
south direction at the intersection of Taylor Court and Holt Road in
compliance with current engineering standard drawings
b. all redundant driveways to the site must be removed and the kerb, footpath
and verge area are reinstated to match the balance of the site frontage,
including the provision of topsoil and turf where the existing verge is
grassed
c. replacement of any removed street trees
d. all necessary linemarking and other traffic measures in Taylor Court and
its intersection with Holts Road to improve traffic safety and address any
potential adverse traffic impacts caused by the increase in traffic generated
by the development.
This condition is imposed pursuant to s665 of the Sustainable Planning Act 2009
being non-trunk infrastructure.
Pedestrian and Bicycle Facilities
22. Pedestrian and bicycle facilities must be provided for the development. The
works must be undertaken in accordance with an Operational Works approval
and must include in particular:
a. signage and lighting at strategic locations to direct people to building
entries.
b. any required pedestrian refuge areas within the carpark to ensure safe and
convenient pedestrians movements within the site.
c. a total of 9 bicycle parking spaces and 5 end of trip lockers.
Electricity and Telecommunication Services
23. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits
and pipes to accommodate the future connection of optic fibre technology
telecommunications.
24. Any requirement by a service provider to alter, upgrade or encase an existing
service within the work site must be carried out at the applicant’s expense.
25. Certification must be submitted to Council from all relevant service providers
which certifies that the development has met the requirements of this Decision
Notice and all applicable legislation at the time of construction.
Damage to Services and Assets
26. Any damage caused to existing services and assets above or below the ground
must be repaired:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the
development.
Page 33 of 52