GENERAL COMMITTEE MEETING 16 JANUARY 2017
Any repair work which proposes to alter the alignment or level of existing
services and assets must first be referred to the relevant service authority
for approval.
Stormwater Drainage
27. The site must be provided with a stormwater drainage system connecting to a
lawful point of discharge. The works must be undertaken in accordance with an
Operational Works approval and the Queensland Urban Drainage Manual, and
must include in particular:
a. No adverse impact on other properties and the road’s footpath and grassed
verge (e.g. by diverting flows and/or blocking flows and causing additional
ponding)
b. The use of gravity stormwater drainage only and not surcharge pits or
pumps.
c. collection and discharge of stormwater to Taylor Court.
d. A stormwater detention system to manage peak flows for all storms up to
and including 1 in 100 years storm event
e. A stormwater quality treatment system. The stormwater treatment must
generally be in accordance with the Stormwater Management Plan For
Highway Service Centre Cooroy, project number 161968 by Covey
Associates, dated October 2016 except where alteration to impervious area
and water quality treatment dimensions are necessary to achieve the
following objectives as predicted in MUSIC modelling in accordance with
the Water by Design MUSIC modelling guidelines.
State Planning Environmental Approved Plan of
Policy Protection Water Development
Policy Water Water Quality
Quality Objectives Criteria
Total 90% reduction <6mg/L 90th%ile 15mg/L
Suspended compared to an
Solids unmitigated
development
Total 60% reduction Maximum 50ug/L Maximum 0.03mg/L
Phosphorous compared to an
unmitigated
development
Total 45% reduction Maximum 500 ug/L Maximum 0.3mg/L
Nitrogen compared to an
unmitigated
development
f. The development must include bins with educational signage material to
encourage patrons who purchase items that generate gross pollutants to
dispose of such items appropriately, and not where they may enter
stormwater systems.
Page 34 of 52