Original source · versioned page text
2017-01-16 General Committee Meeting Notes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING 16 JANUARY 2017
c. be capable of detecting a leak at a rate of 0.76L per hour or more with at
least 95% accuracy and a probability of false detection of 0.05 or less
(United States Environmental Protection Agency (USEPA)
d. be certified by an independent third party, consistent with the current
USEPA protocols and system of verification (USEPA 1990, 40 Code of
Federal Regulation Part 280, Subpart D)
41. A Certificate of Compliance must be provided by the independent third party that
the UPSS leak detection system is consistent with the current USEPA protocols
and system of verification and be provided to Council prior to the commissioning
the UPSS.
Leak Detection System for Underground Tanks
42. The following leak detection systems must be used for the underground tanks:
a. statistical inventory reconciliation (SIR) that includes a software-based
system where daily tank dip readings, delivery records and sales records
are entered onto a proprietary software package; or
b. automatic tank gauging (ATG) that includes an automatic system using an
arrangement of sensor probes and other devices that monitor the
underground petroleum storage system and provide inventory information
and leak testing;
c. a tank pit observation well at the lowest point of each tank excavation pit.
43. Leak detection systems for the underground pipework must include:
a. electronic line leak detection (ELLD) for pressure piping; or
b. safe suction for suction piping;
c. for remote fill lines, a statistical inventory reconciliation system to monitor
leaks in the fill lines.
44. All underground pipework must be made of approved, non-corrodible materials
which include either:
a. fibre-reinforced thermosetting resin composite (fibreglass) compatible with
the product to be transferred; or
b. flexible plastic meeting the requirements of UL971 Standard for non-
metallic underground piping for flammable liquids.
45. All product piping must have secondary containment consisting of double-walled
piping with an interstitial space.
46. A Certificate of Compliance must be provided by the manufacturer certifying that
the pipework meets the Standard and be provided to Council prior to the
commissioning the UPSS.
Fill/Vapour Recovery Points
47. Each tank fill point must be:
a. clearly labelled and identified in compliance with AS 4977-2008 Petroleum
products - Pipeline, road tanker compartment and underground tank
identification
b. fitted with a camlock type or other liquid-tight connection
Page 37 of 52