RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING 16 JANUARY 2017
31. Certification must be provided to Council from a suitably qualified person* which
certifies that the design, construction, operation and safety of the MQW
(specifically including the design and operation of the stormwater quality
improvement device: treatment tank/Stormwater 360 pods filter cartridges &
detention tank) complies in all respects with the WHSQ Code prior to
commissioning the site.
A suitably qualified person* is a Registered Professional Engineer of Queensland
with experience and knowledge in the design and operation of the storage and
dispensing of petroleum products.
Environmental Protection – General Environmental Duty S319
32. A copy of this decision notice must be kept on site in a location readily accessible
to personnel carrying out this activity.
33. Notwithstanding any other condition of this decision notice, this notice does not
authorize any release of contaminants that cause or is likely to cause an
environmental nuisance beyond the boundary of the property.
Underground Tanks
34. The underground petroleum storage system (UPSS) must be designed by a
suitably qualified person** with relevant industry experience, and a copy of the
design certification must be provided to Council prior to issue of development
permit for operational works.
35. Underground tanks must be non-corrodible and be constructed of either:
a. fibre-reinforced thermosetting resin (fibreglass) that is compatible with the
product; or
b. a steel inner wall and a fibre-reinforced thermosetting resin composite
(fibreglass) outer wall with an interstitial space between the 2 walls.
36. Underground tanks must be double walled and have an interstitial space between
the two (2) walls of the tanks that is capable of being monitored for any breach
of either the inner or outer wall of the tank.
37. All tanks are to meet the requirements of UL 1316 Glass fibre reinforced
underground storage tanks for petroleum products, alcohols and alcohol gasoline
mixtures or the equivalent.
38. A Certificate of Compliance must be provided by the manufacturer of the tanks
to Council prior to the commissioning of the tanks for service.
39. An overfill protection valve must be installed in the drop tube of the tank and
calibrated to prevent the tank from being filled in excess of 90% of its capacity.
An overfill alarm must be installed to visually and audibly alert persons in the
vicinity of the tank.
Leak Detection UPSS
40. The leak detection system of the UPSS must:
a. detect a leak from any portion of the underground storage system
b. use equipment that has been installed, calibrated and commissioned in
accordance with the manufacturer's instructions
Page 36 of 52
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.