Original source · versioned page text
Information Response
As such, the requirement to amend the plans as per below is not applicable and the applicant intends to
proceed with the driveway location as originally proposed. Elimination of trip hazards has been addressed
in Item 4. In addition, a Site Plan showing Tree 3 TPZ has been prepared by Menzie Designer Homes,
which confirms the proposed driveway will be located outside of the recommended TPZ.
Item 3
Provide an amended plan demonstrating a suitable location and design of the proposed
crossover and driveway as to ensure the existing Bloodwood street trees remain
undamaged. The amended plan must be prepared by a suitably qualified person (RPEQ –
Registered Professional Engineer of Queensland) and include, but not be limited to:
a. a design generally in accordance with RS-049, RS-050 and any associated addendum;
b. levels and grades of the proposed crossover and driveway;
c. a longitudinal section extending from the centreline of the road formation in Dwyer
Street to the garage pad level; and
d. demonstrate that a B99 vehicle (as described by AUSTROADS) will not bottom out or
scrape while entering/exiting the proposed crossover and driveway.
Response: As per Item 1, no changes to the driveway are required in accordance with the Arborist Brief.
The Engineering Plans confirm the design is generally in accordance with Standard Drawing RS-049,
provides levels and grades of the proposed crossover and driveway a longitudinal section and
demonstrates a B85 vehicle will not bottom out or scrape. The Project Engineer has intentionally used a
B85 vehicle as it’s a lower ground clearance than a B99 vehicle.
Item 4
Provide an amended plan that demonstrates how trip hazards will be eliminated within the
road reserve due to the construction of the proposed driveway crossover. Please note that
Council is unlikely to support private retaining structures within the road reserve. The
amended plan must be prepared by a suitably qualified person (RPEQ – Registered
Professional Engineer of Queensland) and include, but not be limited to:
a. the full extent of the transition to the adjoining areas of verge.
Response: Please refer to the amended Engineering Plans prepared by DME Projects. Reprofiling of the
verge is required to ensure no trip hazards. A transition batter at a maximum of 1:8 is proposed either
side of the driveway. Turf will be provided to match the existing frontage.
We thank Council on behalf of the applicant for assessing the attached additional application material.
Based on the information provided in this application we respectfully request that Council proceed to
issue an approval. Should you have any questions with respect to the above, please do not hesitate to
contact me directly.
Yours faithfully,
Adapt Town Planning + Development Management
Tiani Boulton
Director
E: [email protected]
M: 0404 924 160
2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.