Original source · versioned page text
PM Submission Object - Peter Friis MCU16/0153 & REC16/0041
PLEASE SEND IN SUBMISSIONS TO COUNCIL PRIOR TO THE FINAL DATE OF 267H APRIL 2017 secondary dwelling will require a separate carpark which will not be available if the present DA is approved. I submit that the secondary dwelling should either be removed in its entirety or, at very least, the associated kitchen and living area should not be approved. The current DA proposes that these Reed Beach Houses will be for permanent residents and with 2 persons sharing each of four bedrooms that could result in 80 permanent residents in the Reed Beach House alone. As stated in the Information Request at page 9 of 13 “The proposed land use is a substantial variation from that which has ‘ previously been approved on the site or is supported under the Open Space Recreation Zone. As the proposed style of development is more consistent with that expected to be found within the nearby Semi-Attached Housing Zone it is considered that the development should be compatible to both the Specific Outcomes and Probable Solutions for the Eastern Beaches Locality related to the Semi-Attached Housing Zone and the existing built form and established character within Peregian Beach. ‘ COMMENT: in the my opinion, the design for the Reed Beach Houses is upside down. The bedrooms should be on the ground floor and the living areas on the first floor. This would enable the living areas to have greater solar access and, if the secondary dwelling units are removed, give them the possibility of some outlook, which is not available with the current design. 14, Building Heights : As a result of the proposed filling of the site both the Multiple Housing dwellings and Visitor Accommodation / Shared Housing building exceed the preferred maximum building height. Of particular concern is the height of the Hotel/Motel building and how this may affect vistas from David Low Way towards the National Park and Cooroy Mountain. If the DA is approved, Council will need to specify the height of this building to ensure that the vista is maintained. 15. Relevant period of approval The first development application by this developer for this site was lodged in 2009. The developer received the first approval for developing accommodation in 2010. Now in 2017, the developer is seeking another approval to build, not budget visitor accommodation but, in the main, permanent resident accommodation. In the intervening years, despite having approval the developer has not constructed any accommodation units on the site. The developer, therefore, since 2009, has deprived visitors to Peregian Beach of the low cost visitor accommodation that the caravan park provided. If Council were to approve this DA in any form, I request that the period of approval be reasonable but short and that the Staging be reversed to provide for the Hotel to be exclusively for visitor accommodation with the possible exception of one or two manager/caretaker’s units. I also request that the developer be informed that the period of approval will not be extended. $
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.