Skip to the record
Every meeting, every word.

Original source · versioned page text

PM Submission Object - Peter Friis MCU16/0153 & REC16/0041

of 10

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

PLEASE SEND IN SUBMISSIONS TO COUNCIL PRIOR TO THE FINAL DATE OF
2678 APRIL 2017

The air-conditioning and refrigeration plant for the IGA are mounted on the roof
of the IGA store will be a source of noise for the residents of the Hotel/Motel.
There will also be noise from the IGA loading dock.

The air-conditioning and refrigeration plant for the Peregian Beach Hotel are
mounted on the rear of the Hotel. This will be will be a source of noise for the
residents of the Reed Houses who will be 6 metres below the ground level of the
Peregian Beach Hotel.

I consider that the developer should be required to submit a noise mitigation
plan agreed between the Peregian Beach Hotel and the developer with a formal
commitment by each party to implement the plan, prior to any proposed
development being considered by Council. The implementation of the plan is to
be certified by a suitably qualified and independent acoustic consultant. It will be
too late if Council approves the DA and the Peregian Beach Hotel and the
developer cannot reach agreement.

8. The Vista from David Low Way

, It appears that the Hotel/Motel will not obscure the vista of the western
mountains from David Low Way. This vista needs to be protected. The
accommodation units will be behind and below the Peregian Beach Hotel by
about 6m and, therefore, will not be visible from David Low Way but it is
important that they do not exceed the height allowed under the Noosa Plan
especially along Rufous Lane.

9. Sprout Architects Site Sections shows a 12m height above natural ground
level especially for Lot 12 which would appear'to be grossly excessive.

10. Pathway through the development

It is proposed to provide a public pathway linking Rufous Lane with the IGA and
the Motel and through the Supermarket site to both Sandpiper Lane and David
Low Way (via the lift). This pathway is desirable if the DA is approved.

11. Sprout Architects Ground Floor Hotel - MPR? Meal Preparation Room?
I do not understand why the change from “Motel” to “Hotel” or whether or not this
has any significance.

12. Sprout Architects Reed House Section Analysis

1 consider that the amount of solar access and ventilation is limited and
inappropriate according to this analysis. The number of hours of solar access that
these windows and open spaces will receive is not clear. The apparent inadequacy
is caused by the developer’s attempt to maximize the density and ground coverage
of the site.

13, The Reed Beach Houses - secondary dwelling units

While I realize that the developer has provided a physical linkage from each
secondary dwelling to the main dwelling unit, the fact still remains that the
secondary dwelling can be locked off and separately occupied. If this occurs the
Log in to download the original file

PM Submission Object - Peter Friis MCU16_0153 & REC16_0041.pdf · 674 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.