Original source · versioned page text
PM Submission Object - Peter Friis MCU16/0153 & REC16/0041
PLEASE SEND IN SUBMISSIONS TO COUNCIL PRIOR TO THE FINAL DATE OF 267 APRIL 2017 This concern is increased by the fact that the commercial building, which the developer replaced with the IGA supermarket, provided for visitor accommodation. Now this DA provides for less visitor accommodation on the entire site than was originally sanctioned by the Planning and Environment Court approval of 12 February 2010. I have serious concerns about the density, site cover, gross floor area, planting area and plot ratio having regard to the limitations in the Specific Outcomes for the Eastern Beaches Locality (Semi-Attached Housing Zone). These calculations should be based on a site area which excludes the land dedication included in the Court Order approval (Appeal 25847 of 2008) but which does not exclude the land associated with the Shopping Centre approval. 4. Staging The Sprout Architects Staging Plan shows that the developer proposes:- Stage 1 = Multiple Housing of 3 types _ Stage 2 = Hotel/Motel Given, the location of Stage 1 in a swampy area overlooking wetlands, at least 6 metres below and behind the Peregian Beach Hotel to the east and the IGA supermarket to the south, the developer’s suggested marketing of these houses at $725,000 to $800,000 must raise real doubts as to whether or not any of these houses will be built. This is especially the case if the developer requires a 60 percent pre-commitment before commencing,construction. Council, of course, could not consider the proposed pricing of these houses as low cost or budget accommodation. While this is the developer’s risk, it has a bearing on the completion of the proposed Stage 2 with the visitor accommodation. Therefore, the completion of Stage 2, which contains the developer’s limited commitment to visitor accommodation must be seriously doubted. Task that Council consider the sincerity of the developer in providing visitor accommodation when it is left to Stage 2 and the developer’s record to date of having built no visitor accommodation since 2009. 5. Disruption to Peregian Village and surrounding areas during construction if this DA is approved 5.1 Engineering Services Report - Page 5 in Response 2B states:- “There will be earthworks required to facilitate construction of stormwater treatment facilities, sanitary drainage and allow for an aesthetically pleasing and functional built form. There is little opportunity for fill material to be won on site therefore most of the fill material will need to be imported’. While the total amount of fill required does not seem to have been identified Figure 6 “illustrates the ‘swampy’ nature of the lower area of the site in the vicinity of the proposed gabion wall” and states that “a fill wall of approximately 2.0m will be required”.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.