Original source · versioned page text
Engineering Code Assessment Report
Original PDF page 7, section 1. The text section number identifies this passage in the reader.
4. CONCULSION The proposed multiple unit development located at 32 Viewland Drive Noosa Heads has been assessed for engineering feasibility and requirements on stormwater, water and sewerage services. The proposed development can be adequately serviced by existing local infrastructure in accordance with Noosa Council Guidelines, Unity Water Guidelines and relevant Australian Standards For water supply, a new 32mm water connection and sub metering to be installed in accordance with the Infrastructure Design Code. An additional 100mm fire service will be provided to the site if required. For sewerage, a DN150 property connection will be provided from the existing infrastructure by extending the line up Viewland Drive. Stormwater drainage has been designed for the development to cater for the 10%AEP and 1%AEP events. Stormwater will be connected into the existing stormwater manhole on the corner of The Quarterdeck and Viewland Drive. Stormwater detention and a Stormwater Quality Improvement Device (SPELT System) will be installed on the site prior to discharging into Council’s infrastructure. Please see Neil McKenzie & Associates Site Based Stormwater Management Plan for full details. NMA_ECAR_19323 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.