Original source · versioned page text
Engineering Code Assessment Report
Original PDF page 6, section 1. The text section number identifies this passage in the reader.
3. ENGINEERING COMPLIANCE 3.1 INFRASTRUCTURE CODES The performance criteria and code response for the development in relation to the Infrastructure Code has been provided in Appendix C 3.1.2 WATER AND SEWERAGE RETICULATION There is an existing reticulated water main located along Viewland Drive. A new 32mm water meter is proposed to connect to existing water network at Viewland Drive to the new development. Appropriate sub metering will be installed at the street frontage of the development. A sewer property connection is not available to the site. It is proposed to run an extension to the gravity sewer in Viewland Drive to the site. Refer to the proposed sewer extension design drawings in Appendix D for detail. Approval will be sought from Unity Water for the proposal. 3.1.3 ELECTRICITY SERVICES There are existing electrical services along Viewland Road. The capacity of the existing electrical reticulation will be required to be confirmed by Energex. 3.2 STORMWATER DRAINAGE Refer to Neil McKenzie & Associates Site Based Stormwater Management Report. 3.3 SITE EARTHWORKS CODE The performance criteria and code response for the development in relation to the Infrastructure Code has been provided in Appendix C NMA_ECAR_19323 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.