Skip to the record
The only place to find full transcripts.

Original source · versioned page text

2019-12-10 Services & Organisation Committee Agenda

of 69

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                             10 DECEMBER 2019



REPORTS FOR CONSIDERATION OF THE COMMITTEE


1                        COUNCILLOR REPRESENTATION ON THE NOOSA CYCLING & WALKING
                         STRATEGY AND THE NOOSA HIGH PRIORITY CYCLE CORRIDOR - PROJECT
                         CONTROL GROUPS
DOCUMENT INFORM AT ION




Author                              Infrastructure Planning, Design & Delivery Manager, Craig Eldridge
                                    Infrastructure Services Dept

Index                               ECM/ Subject/ Councillors/ Mayor – Governance & Administration
                                    ECM/ Projects (T1)/ Shire Wide Walking and Cycling Strategy –
                                    CAP.WORK - 501009

Attachments                         Nil



EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Infrastructure Planning, Design and Delivery Manager to the
Services & Organisation Committee Meeting dated 10 December 2019 and appoint the following
three Councillors, Cr _________, Cr __________ and Cr __________ as members of Noosa
Cycling & Walking Strategy and Highest Priority Cycling Corridors – Project Control Group
(PCG).


REPORT
1.                       Formation of a Noosa Cycling & Walking Strategy and Highest Priority Route Cycling
                         Corridors – Project Control Groups (PCG)
Currently Noosa Council has 2 projects in the 2019/20 capital works program:
1.                       Noosa Cycling and Walking Strategy and Implementation Plan (Including Recreational
                         Strategy)
2.                       Noosa High Priority Route Options Analysis - Cycling Corridor Planning Study
The Noosa Cycling and Walking Strategy and Implementation Plan (including the Recreational
Strategy) will update the existing Noosa Cycling and Walking Strategy (2004-2016) and develop
an Action Plan, incorporating cycling and walking for transport, recreational and health including
connections to the Noosa Trail Network, mountain biking tracks and competitive cycling
opportunities. The Strategy will re-establish a vision for cycling and walking in Noosa for the next
20 years (2020-2040), prepare updated network planning, as well as produce a five-year and ten
year capital works program of prioritised projects.
Noosa High Priority Route Options Analysis - Cycling Corridor Planning Study will undertake an
options analysis and concept design to identify on and off road cycling routes for two priority
corridors in Noosa Shire including preparation of a staged and costed implementation plan for the
routes. The two corridors are:
                       Corridor 1: Tewantin to Noosa Heads (east west link)
                       Corridor 2: Noosa Heads to Peregian Beach (north south link/Coastal Pathway)


                                                                                                        Page 3 of 69
Log in to download the original file

2019-12-10 Services & Organisation Committee Agenda(PDF, 5MB).pdf · 5.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.