Delegated Report - Code - Planning MCU26 0040, OPW26 0066 & RAL26 0013 (As Published)
DEVELOPMENT ASSESSMENT DELEGATED REPORT
Author Senior Development Planner, Georgina Schramm
Development Assessment
APPLICATION DETAILS
Application No. MCU26/0040, OPW26/0066 & RAL26/0013
Applicant Pace Planning Pty Ltd
Proposal Material Change of Use - Low Impact Industry, Transport Depot
Operational Works – Road Work, Drainage Work, Stormwater,
Earthworks & Landscaping
Reconfiguring a Lot – Community Title Subdivision (1 Lot into 54
Lots)
Properly Made Date 15 May 2026
Information Request Date 15 May 2026
Information Response Date 5 June 2026
Decision Due Date 6 August 2026
Report Reviewed & Ben Micallef – 7 August 2026
Finalised By
PROPERTY DETAILS
Property Address 18 Taylor Ct Cooroy Qld 4563
RP Description Lot 2 SP 197517
Land Area 20,160m² / 2.01 hectares
Existing Use of Land Industrial
STATUTORY DETAILS
SEQRP Designation Urban Footprint
Zone Low Impact Industry
Precinct Not applicable
Local Plan Area Cooroy Local Plan
Overlays Not applicable
Assessment Type Code
Document Set ID: 25021329
Version: 9, Version Date: 12/08/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 32 pages
Page 2
1. PROPOSAL
The application seeks approval for a Material Change of Use - Low impact industry, Transport
Depot (54 units), Operational Works – Road Work, Drainage Work, Stormwater, Earthworks &
Landscaping, and Reconfiguring a Lot – Community Title Subdivision (1 Lot into 54 Lots).
The 54 tenancies are spread across 4 buildings, Buildings A-D, and are proposed to be carried out
in 5 stages. The staging of the development is intended to facilitate progressive creation of each
stage balance lot to achieve progression construction and plan sealing.
The proposed Transport Depot is proposed to operate ancillary to a Low Impact Industry function,
alike a contractor’s depot, such as carpenters, painters, electricians, small earthmoving business
etc.
Each tenancy consists of ground floor bathroom amenities and an upper-level mezzanine access
via stairs.
Building A (Stage 1) consists of 11 tenancies.
Building B (Stage 2) consists of 11 tenancies.
Building C (Stage 4) consists of 14 tenancies
Building D (Stage 3) consists of 8 tenancies
Building D (Stage 5) consists of 10 tenancies.
The applicant proposes that end of trip facilities are to be provided within each tenancy.
The locality and proposal plan are included below.
Figure 1 – Locality
Page 2 of 33
Document Set ID: 25021329
Version: 9, Version Date: 12/08/2026
Page 3
Figure 2 – Site Plan
Figure 3 – Elevation
Page 3 of 33
Document Set ID: 25021329
Version: 9, Version Date: 12/08/2026
Page 4
Figure 4 – Eastern Elevation (adjoining existing industrial lot)
Figure 5 – Western Elevation (adjoining reserve)
Page 4 of 33
Document Set ID: 25021329
Version: 9, Version Date: 12/08/2026
Page 5
Figure 6 – Development Layout and Proposed Staging
2. APPLICATION BACKGROUND
A previous application was lodged however due to the application having lapsed was withdrawn
and the subject application was submitted.
An Information Request was issued on 15 May 2026, and included items regarding:
- Articulation of wall along the western boundary
- Suitability of Caretakers Accommodation
- Infrastructure Staging
- Waste Management
The applicant provided additional information to suitably address the items contained within the
information request and subsequent further advice.
3. SITE DETAILS
3.1. Site History
The Taylor Court subdivision was formed in 2008, which included the creation of an access
easement in favour of the subject site and adjoining premises. The subject site does not benefit
from any development approvals. Based off aerial imagery the site remained vacant and
undisturbed until 2019 and has been operating without approval.
3.2. Site Description
The subject site has been filled and looks to be 100% hardstand. Prior to filling, the site fell to the
north-east.
3.3. Surrounding Land Uses
Surrounding land uses consist of industrial tenancies to the north and east of the site. Land
adjoining to the site to the south and west is zoned Environmental Management and Conservation
which acts as a buffer to surrounding rural uses.
Page 5 of 33
Document Set ID: 25021329
Version: 9, Version Date: 12/08/2026
Page 6
4. ASSESSMENT
4.1. Instruments for Statutory Assessment
Under the Planning Act 2016 the application must be assessed against each of the following
statutory planning instruments to the extent they are relevant to the development:
• State Planning Policy;
• South East Queensland Regional Plan;
• Planning Regulation 2017; and
• Noosa Plan 2020 (20 March 2026)
4.2. Noosa Plan 2020
The following codes from the Noosa Plan 2020 are applicable to this development:
• Low Impact Industry Zone Code;
• Cooroy Local Plan Code;
• Industry Activities Use Code;
• Works Codes;
• Regional Infrastructure Overlay Code.
The subject site is located in Cooroy and is zoned Low Impact Industry. The proposed use is
identified as a consistent use within the zone and is required to follow a code assessable
application process.
The application has been found to generally comply with all applicable statutory instruments. The
pertinent issues arising out of the assessment are discussed below:
Criteria Planning Scheme Proposal Complies
Building height
• storeys 2 storeys max 2 storeys
• metres 10 metres 7.4 metres
Boundary setbacks
Side (north) 0.0 metres in 16 metres
Side (east) 0.0 metres 0 metres
Side (south) 3.0 metres 3-11 metres
Side (west) 3.0 metres 0 metres X
Landscaping 3024m² 3043m²
Landscaped open space
Carparking 126 car parking spaces 126 car parking spaces
based off a total gross floor
8 motorbike spaces
area of 12,031m2
X
Bicycle Spaces 34 bicycle spaces To be conditioned
End of Trip Facilities* 1 locker per 2 bicycle Lockers and showers
spaces and; contained within respective
*(required only where 5
tenancies shower cubicles
+ spaces are required)
Page 6 of 33
Document Set ID: 25021329
Version: 9, Version Date: 12/08/2026
Page 7
Criteria Planning Scheme Proposal Complies
1 shower cubicle with
ancillary change room per
10 bicycle spaces
Building Presentation
The finishes and presentation of Building C has been conditioned to be revised. The roof form to
the northern elevation is to be extended to provide greater depth and articulation to the façade.
This treatment will assist in breaking up the building mass and creating a clear distinction between
the ground level and mezzanine. This could be achieved by incorporating aluminium panels to the
upper level, to further reinforce architectural differentiation and contributes to a more refined built
form outcome. From review of the existing industrial developments within Taylor Court and the
defining architectural/design features, Officers have identified scope to incorporate some of these
design elements into the proposal. The proposed plan amendments seek to leverage the existing
design outcomes on neighbouring site and provide a consistent (but unique to the site) design
response, with ‘inspiration’ shown in the Figures below.
Figure 7 – Elevation of 5 Taylor Court small warehouse development, noting the design response to Taylor
Court
Figure 8 – Elevation of 1 Taylor Court small warehouse development, noting the design response to Taylor
Court and it’s internal interface
Page 7 of 33
Document Set ID: 25021329
Version: 9, Version Date: 12/08/2026
Page 8
Figure 9 – Elevation of 1 Taylor Court building fronting Taylor Court, noting the extended roof form, use of
window shrouds and vertical cladding.
In addition, a palette of muted and complementary colours has been incorporated throughout the
development to provide visual variation and interest while responding appropriately to the
established character of the surrounding area.
The buildings will be finished with a series of muted colours which provide variation to the built
form. Collectively, these design measures improve the presentation of the development from the
public realm and enhance its integration within the streetscape.
Building Setbacks
Acceptable Outcome AO14 of the Low Impact Industry Zone Code seeks: AO14 Buildings and
roofed structures are setback at least—
Other boundaries—
a. 0.0 metres to boundaries that adjoin land in an industry zone;
b. 10 metres to boundaries adjoining a residential zone;
c. 10 metres to boundaries that adjoin Walter Hay Drive, Eumundi Noosa Road and/or Eenie
Creek Road; and
d. 3 metres to any other boundary
The applicant seeks a nought western side boundary setback in lieu of 3 metres as required by the
Acceptable Outcome and therefore is to be assessed against the correspondence Performance
Outcome.
Performance Outcome PO14 of the Low Impact Industry Zone Code seeks: PO14
Buildings and other structures are appropriately designed and sited to—
a. provide amenity for users of the premises as well as preserve the visual and acoustic
amenity of adjoining and nearby properties
b. maintain access to views and sunlight;
c. provide adequate distance from adjoining land uses;
d. allow space for required vehicle parking;
e. preserve any existing vegetation that will buffer the proposed building;
Page 8 of 33
Document Set ID: 25021329
Version: 9, Version Date: 12/08/2026
Page 9
f. allow for landscaping between buildings and within frontages to soften buildings, car
parking, infrastructure and services;
g. maintain the visual continuity and pattern of buildings and landscape elements within the
street;
h. avoid large areas of continuous wall planes by varying the building setbacks and using
appropriate techniques to provide visual relief;
i. not visually dominate the street or surrounding spaces
j. avoid development within the Holts Road setback
The land adjoining the western side boundary is zoned Environmental Management and
Conservation and is managed by Council in its capacity as trustee. This land functions as a
drainage reserve and is encumbered by an electricity easement. The reserve is approximately 30
metres wide and contains an established planted vegetation buffer along the western and southern
boundaries (refer to Figure 6).
The vegetated buffer is established on a landscaped mound and provides an effective visual
screening and landscape buffer along the entire length of the western boundary.
In addition, the applicant has amended the proposal to incorporate a range of façade colours along
the western elevation, which assists in breaking up the visual bulk and scale of the built form.
The proposed boundary setback is considered appropriate in the context of the site, as it will not
adversely affect the established landscape buffer or diminish its screening function. The
development upholds the Performance Outcome.
Figure 10 – Photograph taken from the reserve at the southern/western boundary
Bicycle Spaces / End-of-trip facilities
Acceptable Outcome AO6.1, AO15 of the Driveways and Parking Codes seeks: AO6.1 The
number of car parking spaces, motorcycle spaces, bicycle spaces and loading bays is not less
than the minimum number specified in Table 9.4.1.4 Minimum parking requirements including end
of trip facilities.
AO15 End-of-trip facilities are maintained and accessible to all users of the premises as part of
common property.
PO15 Site facilities encourage users and employees to access the site by means of foot or bicycle
through provision of appropriate end of-trip facilities including bicycle parking and shower/change
rooms.
Page 9 of 33
Document Set ID: 25021329
Version: 9, Version Date: 12/08/2026
Page 10
The applicant has not proposed any dedicated bicycle parking spaces on common property, with
all bicycle parking instead being allocated within individual tenancies. A condition will be imposed
requiring the provision of 10 bicycle parking spaces on common property.
It is considered reasonable for the remaining 24 required bicycle parking spaces to be
accommodated within the respective tenancies. Furthermore, end-of-trip facilities, including
shower facilities and lockers, are to be provided on site. As such, the proposed arrangement is
considered appropriate as it will support and encourage cycling as a mode of transport for
employees and visitors, upholding the Performance Outcome objective.
Reconfiguring a Lot – Staging of Community Title Scheme
In accordance with the Planning Act 2016, any proposal to stage the titling arrangements of the
development such that a Building Format Plan is registered with a balance lot for future
development will first require a Development Permit for Reconfiguring a Lot.
The applicant proposes to stage the development and accordingly stage the community title
scheme (CTS), and accordingly has triggered reconfiguring a lot development application.
All stages are as illustrated by Plan 04 (I) prepared by Building Suncoast Green.
The proposed staging plan has been reviewed by Council’s Senior Development Engineer, and all
relevant services and infrastructure are proposed to be provided per stage.
5. CONSULTATION
5.1. Referral Agencies
The application was referred to the following Advice Agency:
• Energex Energy
The Advice Agency triggered referral for
• Schedule 10, Part 9, Division 2, Table 1, Item 1 (10.9.2.1.1) – Reconfiguring a lot subject to
an easement for the benefit of a distribution entity under the Electricity Act for a supply
network; or part of the lot is within 100m of a substation site
• Schedule 10, Part 9, Division 2, Table 2, Item 1 (10.9.2.2.1) – Material Change of use of
premises within 100m of a substation site or subject to an easement for the benefit of a
distribution entity under the Electricity Act and the easement is for a supply network
• Schedule 10, Part 9, Division 2, Table 3, Item 1 (10.9.2.3.1) - Operational Work on premises
subject to an easement for the benefit of a distribution entity under the Electricity Act for a
supply network; or part of the lot is within 10m of a substation site
The Advice Agency has responded advising that the development is approved subject to
conditions.
5.2. Internal Council Referrals
The application was forwarded to the following internal Council officers for review and/or comment:
• Senior Development Engineer, Development Assessment – as conditioned.
The pertinent issues are discussed below.
Access
A heavy-duty vehicle crossover is proposed to service the development in accordance with
Council’s standard drawing RS-051. A 300mm wide heavy duty strip drain is proposed to
capture surface flows from within the development and discharge them into Taylors Court
via kerb adapter.
Parking & Manoeuvring Areas
The site is provided with 125 carparking spaces that are generally compliant with AS2890.
Page 10 of 33
Document Set ID: 25021329
Version: 9, Version Date: 12/08/2026
Page 11
There is no directional signage or linemarking to direct traffic through the site. This creates
potential conflict points in Stage 1 and between stage boundaries (i.e., where Stages 1, 2
and 4 meet – and where Stages 1 and 4 meet) where who has ‘right of way’ is not clear. The
risk is manageable through conditioning plan amendments prior to the prestart meeting.
Engineering suggests that direction signage and linemarking could reasonably be
implemented to minimise any conflicts.
Refer to the below extract highlighting the areas of concern.
Figure 11 – Car Parking Manoeuvrability as shown in the submitted Civil Plans
Two loading bays for an articulated vehicle (AV) are provided in Stage 1 and 4. This is
considered appropriate. The extent of internal road is appropriate to facilitate their movement
in a safe manner.
The carparking layout does not include a pedestrian route to address the conflict between
pedestrians accessing various tenancies and vehicles circulating the site. Engineering
suggests that there are various strategies to address this risk, for example signage,
linemarking and other speed controls. A condition has been included.
Waste
A Waste Management Plan has been submitted which details the expected waste generation
for the development. The proposal includes multiple bin storage areas across the
development which provides adequate waste management as each stage is constructed and
tenanted. A Waste Collection Vehicle is able to safely manoeuvre the site and exit in a
forward gear.
Stormwater
A bioretention basin is proposed to be constructed as part of Stage 1. The basin has been
sized to provide treatment to the entire developed site to satisfy the load reduction targets in
the Water Quality and Drainage Code. A dedicated vehicle access ramp has not been
proposed, but the consulting engineer has stated that the proposed 1:3 batter is sufficient to
allow for ongoing maintenance. Since the bioretention basin is privately owned and
maintained, this is considered appropriate.
The basin includes extended detention to attenuate the increase in peak flows during all
events up to, and including, the 1% AEP event with a climate change allowance.
Earthworks
Page 11 of 33
Document Set ID: 25021329
Version: 9, Version Date: 12/08/2026
Page 12
The total balance of earthworks across the site is expected to result in 480m3 of export from
the site with 5,000m3 of cut and 4,500m3 of fill to occur. The maximum height of any retaining
wall that adjoins a neighbouring property is 2.0m.
Summary
Engineering is satisfied that the proposal complies with the relevant provisions of The Noosa
Plan 2020 and recommends the following conditions.
• Senior Environment Officer, Development Assessment – as conditioned.
The applicant has provided a set of detailed landscape plans that address the Noosa Plan
2020 Landscaping code.
The proposed development abuts the western boundary, and a portion of the eastern
boundary. Accordingly, landscaping along these boundaries cannot be achieved in
accordance with the landscape Code.
Suitable species (including a mix of trees shrubs, ground covers and grasses) have been
incorporated within along visible boundaries of the development which will help to soften the
bulk and scale of the development when viewed from neighbouring properties.
Standard landscape conditions have been provided below.
• Waste Collection Officer – no objections.
6. CONCLUSION & REASONS FOR DECISION
The proposed development generally complies with the requirements of the planning scheme and
does not raise any significant issues that cannot be addressed by reasonable and relevant
conditions. The application is therefore recommended for approval.
The report is provided in accordance with Section 63(5) of the Planning Act 2016.
RECOMMENDATION
With regard to Application No MCU26/0040, OPW26/0066, RAL26/0013 for a Material Change of
Use - Low impact industry, Transport depot, Operational Works – Road Work, Drainage Work,
Stormwater, Earthworks & Landscaping, and Reconfiguring a Lot – Community Title Subdivision
(1 Lot into 54 Lots) situated at 18 Taylor Ct Cooroy Qld 4563 and described as Lot 2 SP 197517,
it is recommended the application be approved in accordance with the following details for the
Decision Notice:
1. APPLICATION DETAILS
Application No: MCU26/0040, OPW26/0066, RAL26/0013
Street address: 18 Taylor Ct Cooroy Qld 4563
Real property description: Lot 2 SP 197517
Planning Scheme: Noosa Plan 2020 (Amendment 3 - 20 March 2026)
2. DECISION DETAILS
Council decided to issue the following type of approval:
• Development Permit for a Material Change of Use - Low Impact Industry, Transport Depot
(54 units)
• Development Permit for Operational Works – Road Work, Drainage Work, Stormwater,
Earthworks & Landscaping
• Development Permit for Reconfiguring a Lot – Community Title Subdivision (1 Lot into 54
Lots)
Page 12 of 33
Document Set ID: 25021329
Version: 9, Version Date: 12/08/2026
Page 13
3. CURRENCY PERIOD OF APPROVAL
The currency period for this development approval is stated in the conditions below.
4. ASSESSMENT MANAGER CONDITIONS
PLANNING
When Conditions must be Complied With
1. Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to
the use commencing, and then compliance maintained at all times while the use continues.
Sunset Clause for Completion of Approved Development
2. Pursuant to s88(1) of the Planning Act 2016, the uncompleted aspects of this development
approval lapses if the whole of the approved use has not happened by 6 August 2032,
unless an application to extend the currency period is approved by Council.
Approved Plans
3. Development authorised by this approval must be undertaken generally in accordance with
the Approved Plans listed in the tables below.
The plans must be amended to incorporate the amendments listed within the table below
and resubmitted to Council prior to the issue of Building Works or prior to prestart meeting
(whichever comes first)*.
Plan No. Rev. Plan/Document Name Date
03 I 3D Views prepared by Building Suncoast 26.05.26
Green
04 I Site / Floor Plan Level 1 – OPT 5 (Staging 26.05.26
Plan) prepared by Suncoast Green
Annotated by Council
06 I Floor Plan – Building A_Level 2 prepared by 26.05.26
Building Suncoast Green
08 I Floor Plan – Building B_Level 1 prepared by 26.05.26
Building Suncoast Green
09 I Floor Plan – Building B_Level 2 prepared by 26.05.26
Building Suncoast Green
10 I Roof Plan – Building B_ Level 3 prepared by 26.05.26
Building Suncoast Green
11 I Floor Plan – Building C_Level 1 prepared by 26.05.26
Building Suncoast Green
12 I Floor Plan – Building C_Level 2 prepared by 26.05.26
Building Suncoast Green
13 I Roof Plan – Building C_Level 3 prepared by 26.05.26
Building Suncoast Green
14 I Floor Plan – Buiding D_Level 1 prepared by 26.05.26
Building Suncoast Green
Page 13 of 33
Document Set ID: 25021329
Version: 9, Version Date: 12/08/2026
Page 14
15 I Floor Plan – Building D_Level 1 prepared by 26.05.26
Building Suncoast Green
16 I Floor Plan – Building D_Level 2 prepared by 26.05.26
Building Suncoast Green
17 I Floor Plan – Building D_Level 2 prepared by 26.05.26
Building Suncoast Green
18 I Floor Plan – Building D_Level 3 prepared by 26.05.26
Building Suncoast Green
19 I Floor Plan – Building D_Level 3 prepared by 26.05.26
Building Suncoast Green
20 I Sections prepared by Building Suncoast 26.05.26
Green
21 I Sections prepared by Building Suncoast 26.05.26
Green
24 I Elevations – Building B prepared by 26.05.26
Building Suncoast Green
26 I Elevations – Building D prepared by 26.05.26
Building Suncoast Green
27 I Elevations – Building D prepared by 26.05.26
Building Suncoast Green
The following plans require amendment.
Plan No. Rev. Plan/Document Name Date
01 I 3D Views prepared by Building Suncoast 26.05.26
Green
02 I 3D Views prepared by Building Suncoast 26.05.26
Green
04 I Site / Floor Plan Level 1 – OPT 05 prepared 26.05.26
by Building Suncoast Green
05 I Floor Plan – Building A_ Level 1 prepared 26.05.26
by Building Suncoast Green
06 I Floor Plan – Building A_Level 2 prepared by 26.05.26
Building Suncoast Green
07 I Roof Plan – Building A_Level 3 prepared by 26.05.26
Building Suncoast Green
22 I Elevations – Building A prepared by 26.05.26
Building Suncoast Green
Page 14 of 33
Document Set ID: 25021329
Version: 9, Version Date: 12/08/2026
Page 15
23 I Elevations – Building A prepared by 26.05.26
Building Suncoast Green
25 I Elevations – Building C prepared by 26.05.26
Building Suncoast Green
Amendment 1 Remove the Caretaker’s Accommodation unit in its entirety, while
maintaining the degree of articulation along the Building A interface,
while retaining the screening element that addresses and defines the
site entrance.
Amendment 2 Extend the roof form of Building C along the northern elevation to
provide additional depth and articulation to the façade and create a
clearer distinction between the ground and second storey.
This may be achieved through the incorporation of aluminium panel
cladding across the full extent of the second storey, or a similar
architectural treatment that enhances the visual separation and
breaks up the northern elevation.
*(Refer to Advisory Note)
Development Staging
4. The development may be staged in accordance with the stage boundaries shown on the
Approved Plans.
Nature and Extent of Approved Use
5. The approved use consists of Low Impact Industry tenancies and Transport Depot
(contractors depot).
6. Vehicles associated with the Transport Depot must not be parked within any communal
parking areas for a period exceeding 24 hours.
7. The approved building/s must not be used for the purpose of a self-storage facility.
8. Any administrative functions or retail sale of goods must remain an ancillary component to
the approved use in each tenancy, and must have a direct relationship with the industrial use
(i.e. result from the industrial business activity) and must not exceed 30% of the total gross
floor area of each tenancy.
9. Any food and drink outlet must remain an ancillary component to the approved use, have a
direct relationship with the industrial use (i.e. result from the industrial business activity) and
must not exceed 30% of the total gross floor area of the tenancy or 30m2 whichever is the
lesser.
10. The gross floor area of any retail, food and drink outlet or administration component does not
exceed a combined gross floor area of more than 40% of the total gross floor area of each
tenancy.
Building Height
11. The maximum height of the development must not exceed 10 metres above the ground level.
12. Certification must be submitted to Council from a Registered Cadastral Surveyor (Qld) which
certifies that the building does not exceed the maximum height requirement of this Decision
Notice.
Page 15 of 33
Document Set ID: 25021329
Version: 9, Version Date: 12/08/2026
Page 16
Performance Bond
13. Security in the form of a cash bond or trading bank guarantee to the sum of $20,000 must
be submitted to Council, to secure performance of all conditions of this approval, prior to the
issue prior to pre-start meeting. The cash bond or trading bank guarantee will be returned on
performance of the conditions of approval less any costs incurred by Council in respect of
enforcing performance of this permit. Council reserves the right to call upon the bond or
guaranteed sum to effect compliance with conditions.
Street Identification
14. The street address of the development must be clearly visible and discernible from the
primary frontage of the site by the provision of a street number and, where appropriate, the
building name.
Water & Sewer Connections
15. An underground connection to reticulated water and sewerage must be provided to the
premises in accordance with the standards and requirements of Northern SEQ Distributor–
Retailer Authority (Unitywater).
16. A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority (Unitywater)
must be submitted to Council that certifies an underground connection to reticulated water
and sewerage has been provided to the premises.
Building Appearance
17. External design features, materials and finishes must be as shown on the Approved Plans,
with no inclusions or alterations made without approval in writing by Council.
18. External colours and finishes must be of muted environmental tones, with broad expanses
of a single colour not permitted. Walls must be broken up by varying tones or design
elements.
19. Walls built to side and/or rear boundaries must be professionally finished and painted in an
understated colour scheme.
20. Waste storage areas, external approved storage areas, and mechanical equipment are
screened from the street.
21. No part of the site may be used for outdoor storage of materials unless specified on the
Approved Plans or the conditions of this Decision Notice. Materials stored outside of the
building must not exceed 4 metres in height or half the height of the building, whichever is
the greater.
22. All mechanical equipment and other service infrastructure located on the site must be:
a. located not less than 2 metres from a property boundary
a. fully enclosed or screened such that they are not visible from the street frontages nor
adjoining properties. Where screened by landscaping, landscaping beds must be at
least 1.5 metres wide.
Staff Amenities
23. On site amenities, including seating, tables and rubbish bins, must be provided for staff
protected from weather and removed from any noisy or odorous activities.
Fencing and Walls
24. A 2.0-metre-high solid screen fence must be erected along the full length of the boundaries
of a site where not a building.
Landscaping Works
25. The development site must be landscaped. The works must be undertaken in accordance
with an Operational Works approval and the Noosa Plan for that specific area and must
include in particular:
Page 16 of 33
Document Set ID: 25021329
Version: 9, Version Date: 12/08/2026
Page 17
a. the works shown on the approved plans the works shown on the Approved Plans
b. The landscape area must be mulch to a minimum depth of 100mm.
c. vegetated screening of any electrical transformers, bin storage areas and the like from
the road frontage
26. All landscape works must be established and maintained in accordance with the approved
design for the life of the development, and in a manner that ensures healthy, sustained and
vigorous plant growth. All plant material must be allowed to grow to full form and be
refurbished when its life expectancy is reached.
Waste Management
27. The waste storage enclosures’ external colours and finishes must be of muted/environmental
tones that blend with the natural environment.
28. A waste storage area must be designed and maintained in accordance with Planning
Scheme Policy PSP9 Waste Management and the Noosa Plan’s Waste Management Code.
The waste storage area must be:
a. imperviously paved and correctly sized for all refuse and recycling containers;
b. bunded and graded so that wastewater and bin leakage drain to the sewer;
c. provided with a conveniently located hosecock and backflow prevention device,
connected to a water supply to service the area; and
d. roofed or otherwise covered.
29. A Waste Management Plan must be prepared that details the type and quantity of waste
material that is likely to be generated by the development; where and how the waste will be
stored, disposed of and procedures for handling the waste. The Waste Management Plan
must be submitted and approved by Council prior to the issue of a Development Permit for
Operational Works.
Community Management Statement
30. Any proposed Community Management Statement required for the development pursuant to
the Body Corporate and Community Management Act 1997 must be submitted to Council for
endorsement at the same time as submission of the Building Format Plan (or similar) to
Council for compliance assessment.
31. All clauses and by-laws of the proposed Community Management Statement must accord
with the requirements of this Decision Notice and, in particular, must include the following
additional clauses:
a. No overnight accommodation is permitted onsite unless otherwise approved by
Council.
a. Parking of vehicles associated with the Transport Depot (contractors depot) is not
permitted to be parked within the communal spaces for more than 24 hours.
b. Any overnight vehicle storage must relate to the approved Transport Depot (contractors
depot) as defined within the Noosa Plan 2020.
Site Access and Driveways
32. A sealed access driveway must be provided from Taylor Court to all parking and
manoeuvring areas of the development. The works must be undertaken in accordance with
the conditions of this Decision Notice, be generally in accordance with Barlow Shelley’s
Overall Development Layout Plan (C010, Rev. B) dated 8 May 2026 and must include in
particular:
a. a driveway crossover in accordance with Council’s standard drawing RS-051.
Page 17 of 33
Document Set ID: 25021329
Version: 9, Version Date: 12/08/2026
Page 18
Car Parking
33. A minimum of 126 car parking spaces must be provided and marked on the site and always
made available and accessible while the use is open for business. The works must be
undertaken in accordance with the conditions of this Decision Notice, be generally in
accordance with Barlow Shelley’s Overall Development Layout Plan (C010, Rev. B) dated 8
May 2026 and must include in particular:
a. staff parking spaces within the total, which are clearly marked for that purpose;
b. disabled parking space/s within the total; and
c. dimensions, crossfalls and gradients in accordance with Australian Standard AS2890:
Parking Facilities.
34. The development must be provided with directional signage and linemarking to direct
passenger and service vehicles to the carparking spaces and loading bays provided on site.
The signage and linemarking must identify what vehicles must yield and give way to
oncoming vehicles.
Service Vehicles
35. Service vehicle parking, manoeuvring and standing spaces must be provided on the site.
The works must be undertaken in accordance with the conditions of this Decision Notice and
must always include a loading bay for an articulated vehicle.
Pedestrian and Bicycle Facilities
36. Pedestrian and bicycle facilities must be provided for the development. The works must be
undertaken in accordance with the conditions of this Decision Notice, be generally in
accordance with Barlow Shelley’s Overall Development Layout Plan (C010, Rev. B) dated 8
May 2026 and must include in particular:
a. a traffic management system that provides prioritisation to pedestrians that are
manoeuvring from the carpark areas to each building – the system may include
pavement demarcation, linemarking, signage, speed controls or a combination of but
must be implemented between the car parking areas and the buildings.
b. Bicycle parking for a minimum of 10 spaces is to be provided on common property,
with the remaining 34 spaces to be provided through the development.
Stormwater Drainage
37. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge. The works must be undertaken in accordance with the conditions of this Decision
Notice and be generally in accordance with Barlow Shelley’s Site-Based Stormwater
Management Plan (2576-SBSMP-01, Ver. 2.0) dated 8 April 2026.
38. A stormwater quality treatment system must be provided for the development. The works
must be undertaken in accordance with the conditions of this approval and Water by Design’s
Bioretention Technical Design Guidelines 2014, and must include in particular:
a. stormwater quality treatment devices of a size and location generally in accordance
with those shown in XYZ
b. bioretention device(s) which:
a. are design generally in accordance with IPWEAQ Standard Drawing DS-073,
DS-075 and DS-076; and
b. are provided with a free-draining outlet from the sub-soil drainage system.
39. All bioretention basins must be maintained in accordance with Water by Design’s Maintaining
Vegetated Stormwater Assets (Version 1) 2009.
Page 18 of 33
Document Set ID: 25021329
Version: 9, Version Date: 12/08/2026
Page 19
40. The development shall be provided with approved permanent signage to educate the public
on the function of the bioretention basin. The wording for the signage for the bioretention
basin is to include: “BIORETENTION BASIN – This bioretention basin reduces the pollution
of our waterways by reducing the amount of heavy metals, litter, suspended solids, and
nutrients discharged to Lake MacDonald”.
Services
41. Unless otherwise stipulated by telecommunications legislation at the time of construction, the
development must be provided with all necessary conduits, pits and pipes to accommodate
the future connection of optic fibre technology telecommunications.
42. Certification must be submitted to Council from all relevant service providers (Energex, NBN
and Unitywater) which certifies that the development has met the requirements of this
Decision Notice and all applicable legislation at the time of construction.
Easements
43. Unless otherwise agreed in writing by the relevant service provider, any public or third party
infrastructure located on the subject site must be placed within an easement registered
against the title of the property.
44. All easements must be designed in accordance with the planning scheme and granted at no
cost to the Grantee. Where the Grantee is Council or a service authority, the easement
documentation must be in accordance with the Grantee’s standard easement terms. Draft
easement documentation must be submitted to Council for endorsement.
45. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
46. All earthworks and associated batters/retaining structures, both above and below ground
level, both temporary and permanent, must be undertaken in accordance with the conditions
of this Decision Notice, be generally in accordance with Barlow Shelley’s Bulk Earthworks
Plan (C100, Rev. B) dated 8 May 2026 and contained entirely within the subject site unless
written permission from the respective landowner(s) is provided to Council.
47. All retaining walls must be designed and constructed in accordance with the planning scheme
and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls that
are publicly accessible and exceed 1.0m in height must be fitted with a commercial grade
safety fence.
Page 19 of 33
Document Set ID: 25021329
Version: 9, Version Date: 12/08/2026
Page 20
DEVELOPMENT PERMIT FOR RECONFIGURING A LOT – COMMUNITY TITLE
SUBDIVISION (1 LOT INTO 54 LOTS)
PLANNING
When Conditions Must Be Complied With
1. Unless otherwise stated, all works required by the conditions of this Decision Notice must be
completed for each particular stage prior to submission of the subdivision plan to Council for
compliance assessment.
Sunset Clause for Completion of Approved Development
2. Pursuant to s88(1) of the Planning Act 2016, the uncompleted aspects of this development
approval lapses if the subdivision plan for the last stage of the development has not been
registered by the relevant titles authority by 6 August 2032.
Approved Plans
3. Development authorised by this approval must be undertaken generally in accordance with
the Approved Plans listed in the table below.
Plan No. Rev. Plan/Document Name Date
04 I Site / Floor Plan level 1 – OPT 5 (Staging 26.05.2026
Plan) prepared by Building Suncoast Green
*(Refer to Advisory Note)
4. All lot numbering on the subdivision plan to be submitted to Council for compliance
assessment must remain as shown on the Approved Plans.
Development Staging
5. The development may be staged in accordance with the stage boundaries shown on the
Approved Plans.
Boundary Encroachments
6. Certification must be submitted to Council from a Registered Cadastral Surveyor (Qld) which
certifies that:
a. the setback/s to any new boundaries for any existing buildings remaining on the site
comply with the relevant provisions of the planning scheme and the Building Act 1975,
unless varied by this Decision Notice
b. all constructed access and roadworks (including associated fill batters and retaining
walls) are fully contained within a dedicated reserve or registered easement
c. all utility services and connections (eg. electricity, telecommunications, water,
sewerage) are wholly located within the lot they serve or alternatively included within
an easement
d. all existing effluent disposal areas are wholly located within the lot they serve and
comply with the boundary setback requirements of the Plumbing and Drainage Act
2002 and associated codes and requirements
e. all dams (including ponded water, dam walls and associated spillway structures) are
wholly located within the boundaries of a single lot
f. all retaining walls and structures are fully contained within the lot they retain
g. any fill, including fill batters, are wholly contained within the subject site and not on
adjacent properties
h. for the community title scheme, the road pavement changes required by this Decision
Notice accurately demarcate the boundaries of the public and private land.
Page 20 of 33
Document Set ID: 25021329
Version: 9, Version Date: 12/08/2026
Page 21
Water & Sewer Connections
7. An underground connection to reticulated water and sewerage must be provided to each lot
in accordance with the standards and requirements of Northern SEQ Distributor–Retailer
Authority (Unitywater).
A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority (Unitywater)
must be submitted to Council that certifies an underground connection to reticulated water
and sewerage has been provided to each lot.
Services
8. Underground reticulated electricity and telecommunication services must be provided to
each lot in accordance with an approval for Operational Works and the standards and
requirements of the relevant service provider.
9. Unless otherwise stipulated by telecommunications legislation at the time of construction, the
development must be provided with all necessary conduits, pits and pipes to accommodate
the future connection of optic fibre technology telecommunications.
10. Certification must be submitted to Council from all relevant service providers (Energex, NBN)
which certifies that the development has met the requirements of this Decision Notice and
all applicable legislation at the time of construction.
Community Management Statement
11. Any proposed Community Management Statement required for the development pursuant to
the Body Corporate and Community Management Act 1997 must be submitted to Council for
endorsement at the same time as submission of the Building Format Plan (or similar) to
Council for compliance assessment.
12. All clauses and by-laws of the proposed Community Management Statement must accord
with the requirements of this Decision Notice and, in particular, must include the following
additional clauses:
i. No overnight accommodation is permitted onsite unless otherwise approved by
Council.
j. Parking of vehicles associated with the Transport Depot (contractors depot) is not
permitted to be parked within the communal spaces for more than 24 hours.
k. Any overnight vehicle storage must relate to the approved Transport Depot (contractors
depot) as defined within the Noosa Plan 2020.
Page 21 of 33
Document Set ID: 25021329
Version: 9, Version Date: 12/08/2026
Page 22
DEVELOPMENT PERMIT FOR OPERATIONAL WORKS - ROAD WORK, DRAINAGE WORK,
STORMWATER, EARTHWORKS & LANDSCAPING
Approved Plans
1. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. Where there are inconsistencies between the approved plan
and the conditions of the approval, the conditions of the approval override the approved
plans.
The approved plans are listed in the following table unless otherwise amended by these
conditions.
Plan No. Rev. Plan/Document Name Date
C010 B Overall Development Layout Plan prepared 8 May 2026
by Barlow Shelley
C100 B Bulk Earthworks Plan prepared by Barlow 8 May 2026
Shelley
C101 B Staged Interface Layout Plan – Sheet 1 8 May 2026
prepared by Barlow Shelley
C102 B Staged Interface Layout Plan – Sheet 2 8 May 2026
prepared by Barlow Shelley
C120 B Earthworks Typical Sections (Sheet 1 of 2) 8 May 2026
prepared by Barlow Shelley
C121 B Earthworks Typical Sections (Sheet 2 of 2) 8 May 2026
prepared by Barlow Shelley
C200 B Site Levels Layout Plan prepared by Barlow 8 May 2026
Shelley
C210 B Pavement Jointing Plan prepared by Barlow 8 May 2026
Shelley
C211 B Pavement Jointing Details prepared by 8 May 2026
Barlow Shelley
C300 B Stormwater Drainage Plan prepared by 8 May 2026
Barlow Shelley
C310 B Stormwater Catchment Plan prepared by 8 May 2026
Barlow Shelley
C320 B Stormwater Longitudinal Sections prepared 8 May 2026
by Barlow Shelley
C360 B Bio & Detention Basin Details & Plan 8 May 2026
prepared by Barlow Shelley
2025-68 I Landscape Plan – sheet no. 28 prepared by 26.05.26
Building Coast Green
Page 22 of 33
Document Set ID: 25021329
Version: 9, Version Date: 12/08/2026
Page 23
2025-68 I Landscape Plan – sheet no. 29 prepared by 26.05.26
Building Coast Green
2025-68 I Landscape Plan – sheet no. 30 prepared by 26.05.26
Building Coast Green
2025-68 I Landscape Schedule – sheet no. 31, 26.05.26
prepared by Building Coast Green
Currency Period
2. The Currency Period for this development approval lapses if the development has not
substantially started by 6 August 2031, unless an application to extend the currency period
is approved by Council.
SITE SPECIFIC CONDITIONS
Amended Plans
3. Submit a “Signage & Linemarking Plan” that includes directional signage, linemarking and
details of a traffic management system pursuant to Conditions 3 and 5 of this Decision Notice.
The additional plan must be prepared by a suitably qualified person (RPEQ) and be
submitted and approved by Council prior to the pre-start meeting.
Erosion and Sediment Control Plans
4. Submit a site-specific Erosion and Sediment Control Plan in accordance with the
International Erosion Control Association’s (IECA) Best Practice Erosion and Sediment
Control and prepared by a suitably qualified person (RPEQ and/or CPESC). The Plan must
be submitted prior to the commencement of works.
5. Prior to the commencement of bulk earthworks:
a. a hold-point inspection is required with a Council delegate to review that the erosion
and sediment controls on-site generally reflect the Erosion and Sediment Control Plan.
b. certification from a suitably qualified person (RPEQ and/or CPESC) must be submitted
to Council certifying that the erosion and sediment controls on site have been installed
in accordance with the Plan and IECA’s Best Practice Erosion and Sediment Control.
PRIOR TO COMMENCEMENT OF WORKS
Engineering
6. Council must be contacted at least 5 working days prior to any works commencing to
organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500. The
pre-start meeting must include the relevant parties for the following aspects of the works:
a. civil engineering works;
b. landscape works;
c. erosion and sediment control works; and
d. other relevant parties.
A proxy may be nominated for any party unable to attend the meeting. Council must be
notified of any proxies prior to the pre-start meeting.
7. Submit a copy of the approved plans that are issued “For Construction” and duly signed by
the consultant Registered Professional Engineer of Queensland (RPEQ). Plans must be
submitted and approved by Council prior to the pre-start meeting.
8. Submit certificates demonstrating currency of public liability insurance and works insurance
covering the works. Certificates must be submitted to Council prior to the pre-start meeting.
Page 23 of 33
Document Set ID: 25021329
Version: 9, Version Date: 12/08/2026
Page 24
9. Submit a condition report documenting any existing defects in the road reserve or
infrastructure, including photographs of the site frontage. The report must be submitted to
Council prior to the pre-start meeting.
10. Submit a Construction Management Plan to Council prior to the pre-start meeting. The
Construction Management Plan must specifically address the following:
a. traffic management during all aspects of the construct phase including:
i. a Traffic Management Plan in accordance with Manual of Uniform Traffic Control
Devices (MUTCD) detailing all temporary signage and traffic control measures
prior to construction;
ii. maintenance of safe vehicle and pedestrian access across the frontage of the
site both during daily construction and after daily construction has ceased;
iii. proposed fencing to the site during the construction phase of the development;
iv. adequate parking arrangements for construction workers and deliveries; and
v. no queuing of trucks is permitted on residential streets;
b. maintenance and protection of water quality and existing drainage lines through the
construction site through the implementation of appropriate erosion and sediment
control measures;
c. works programme identifying key components of the works and their respective
durations;
d. establishment of a communication protocol with the general public, adjoining owners,
emergency services and local businesses to advise of agreed construction times,
impacts on traffic and services and other relevant issues;
e. include a post out to the local residents and businesses advising of the proposed
development, the expected time frames and the site contact details;
f. include signage in prominent locations on the boundaries of the site advising of the
proposed development, the expected time frames and the site contact details;
g. identification of complaint management procedures including:
i. contact details for the on-site manager; and
ii. dispute resolution procedures.
11. All necessary approvals from external service providers (e.g., Unitywater) and external
parties on which the development works are proposed have been obtained and a copy
supplied to Council.
12. Any changes to the details associated with the supervising RPEQ or Principal Contractor
during construction, must be notified to council in writing within five business days of the
change occurring.
13. Any conflict between the development and an existing or proposed service must be referred
to the relevant service authority for determination prior to commencement of works.
DURING CONSTRUCTION
Engineering & Environment
14. The developer must meet any costs to repair damage to any Council asset during
construction, where damage is a result of the development works. Damage to assets must
be repaired immediately where it creates a hazard to the community. In circumstances where
the damage does not create a hazard to the community, it must be repaired immediately on
completion of the works associated with the development.
Page 24 of 33
Document Set ID: 25021329
Version: 9, Version Date: 12/08/2026
Page 25
15. All works must be supervised by a Registered Professional Engineer of Queensland (RPEQ)
who is independent of the Developer and Principal Contractor, and they must certify that all
works conform to the Operational Works permit. Where municipal works are involved, such
confirmation must be submitted for the respective hold points prior to any site inspection by
Council Officers.
16. All works must be constructed and work procedure undertaken in accordance with:
a. the approved plans/documents and conditions detailed in this Decision Notice;
b. all relevant Noosa Council Planning Scheme Policies, standard drawings, standard
specifications and guidelines; and
c. the latest version of the Healthy Waterways document “Water Sensitive Urban Design
Technical Design Guidelines for South East Queensland” for all water quality devices
to be constructed on site.
Retention of Existing Trees and Vegetation
17. All trees and vegetation identified for retention including vegetation on neighbouring lots must
be protected in accordance with AS 4970, Protection of trees on development sites.
*(Refer to Advisory Note)
Landscaping Works
a. Landscape works must be supervised, undertaken and certified by qualified persons*.
All works must be completed in accordance with this Decision Notice.
*(Refer to Advisory Note)
18. Where damage occurs to any Council asset as a result of the development works, it must be
repaired immediately where it creates a hazard that presents risk to person or property. Other
damage must be repaired prior to completion of works.
Roadworks
19. All pavement widening or construction of new pavement must join neatly to the existing
pavement so that there are no irregularities in line or level resulting at or adjacent to the join
for the length of the construction. Where necessary the existing pavement must be brought
to a satisfactory standard to allow for the above.
Pavement Design and Construction
20. Pavement design for privately owned works must be undertaken in accordance with the
relevant standards. Structural integrity of the driveway and car park areas will remain the
responsibility of the property owner/developer and must be certified by an RPEQ.
Works within Road Reserve/Reinstatement
21. Safe pedestrian and vehicle access on all streets in the vicinity of the development must be
maintained at all times. Should footpath/road closures be necessary to carry out construction
works, Council’s Engineering Officer must be notified prior to the proposed closure and all
requirements complied with.
22. All frontage works must match neatly with existing road and verge/footpath features.
Additional works beyond the frontage may be required to provide an acceptable transition to
existing road and verge/footpath profiles.
23. Electrical conduits or other services proposed to be installed within existing and proposed
road reserves under existing sealed carriageways, concrete pathways, concrete/sealed
driveways or significant vegetation must be installed by boring. Trenching is not permitted,
unless specifically approved by Council.
Site Access and Driveways
24. Driveway crossovers must be constructed in accordance with council’s Standard Drawings:
Page 25 of 33
Document Set ID: 25021329
Version: 9, Version Date: 12/08/2026
Page 26
b. RS-051 and any associated addendum.
25. Any existing unnecessary or redundant property accesses must be removed, and the kerb,
footpath and verge area reinstated to match the existing footpath and/or verge treatments.
Grassed verge areas to be reinstated must be provided with 100 mm topsoil and grass seed
or turf and must be maintained by the developer until established.
26. The following must be complied with during the construction of the required
crossover/driveway:
a. the driveway surfacing must consist of an approved hot mixed asphaltic concrete or
patterned/plain concrete;
b. decorative surfaces must be approved by Council, have a maximum 5mm depth
variation in the finished surface profile, and comply with AS4586, AS3661.1 and any
associated addendum;
c. the driveway must be constructed so as not to concentrate stormwater runoff onto
neighbouring properties;
d. underground service conduits for water supply, electricity and any other services must
be provided as part of the access driveway;
e. where there is an existing pedestrian path, a matching crossfall must be provided for
the driveway on the alignment of the path, for the full width of the path;
f. have a minimum clearance of 500mm from any Unitywater/Energex/Telstra asset,
unless a written approval is obtained from Unitywater/Energex/Telstra and submitted
to Council; and
g. the property access must be located a minimum of 1m clear of existing power poles,
streetlights or other signage.
The developer is responsible for any necessary relocation of existing services to
provide this clearance and must contact the relevant service authorities and comply
with their requirements in relation to these works.
Earthworks and Retaining Walls
27. All earthworks shall be undertaken in accordance with the provisions of AS 3798 Guidelines
on Earthworks for Commercial and Residential Development, with geotechnical testing
undertaken in accordance with Section 8 of the Standard, and to a minimum of ‘Level 1’ as
defined in Appendix B. Test results as required by AS 3798, and a certificate of quality and
uniformity of fill shall be provided by a RPEQ and submitted to Council prior to the
commencement of the use.
28. All earthworks and associated batters/retaining structures, both above and below ground
level, both temporary and permanent, must be contained entirely within the subject site
unless written permission from the respective landowner(s) is provided to Council.
29. Fall protection must be provided to retaining walls that are over 1m high.
30. Slope and batters are a maximum grade of:
a. 1 in 6 where in proximity to waterbodies;
b. 1 in 4 for grassed areas;
c. 1 in 3 for planted areas; and
d. 1 in 2 for combined structural engineering and planting solutions.
Stormwater Drainage
31. Appropriate scour protection must be provided at the outlet of all stormwater pipes including
temporary outlets.
Page 26 of 33
Document Set ID: 25021329
Version: 9, Version Date: 12/08/2026
Page 27
32. Works associated with this permit must not adversely impact on the existing drainage
conditions on other properties (e.g., by blocking or interfering with natural overland flows).
33. Construction of all internal stormwater drainage works must comply with the relevant
section/s of Australian Standard AS/NZS 3500.3.
Erosion and Sediment Control
34. Prescribed Water Contaminants (as defined in Schedule 10 of Environmental Protection
Regulation 2019) must not be released from the site or to waters within the site, or be likely
to be released should rainfall occur, unless all reasonable and practicable measures are
taken to prevent or minimise the release and concentration of contamination.
35. Sediment and erosion control measures must be in place prior to works commencing. If such
measures are not in place or are not satisfactory, “on the spot” fines may be issued. Such
fines can be issued if sediments from the site are found to enter or have the potential to enter
Council’s stormwater system, natural waterways, any downstream stormwater filtration
system or adversely impacting on other properties.
The sediment and erosion control design and measures have NOT been approved, it is the
site's Supervising Engineer who is responsible for ensuring that the sediment and erosion
control measures have:
a. Been duly designed by an RPEQ or CPESC and constructed in accordance with "best
practise" methods;
b. Been revised by an RPEQ or CPESC to address the issues raised by changes in the
projected construction schedule and/or methods;
c. Been revised to address predicted rainfall events; and
d. Achieve the desired environmental outcomes.
Council may request further controls to be installed should the implemented measures be
found inefficient.
36. The erosion and sediment control measures must be designed, installed and maintained in
accordance with the supervising engineer’s instructions and the current best practice
standards. A copy of the latest erosion and sediment control plan, prepared and endorsed
by a suitably qualified person (RPEQ/CPESC), must be made available to Council within 5
business of request.
*(Refer to Advisory Note)
37. All erosion and sediment controls must be inspected to ensure the controls are not being
bypassed. Inspections must occur and be electronically recorded:
a. at least daily (when work is occurring on site) or weekly (when work is not occurring on
site); or
b. within 24 hours of expected rain; or
c. within 18 hours of a rainfall event (i.e. an event of sufficient intensity and duration to
mobilise sediment on site).
38. The developer must ensure non-essential exposure of soil is prevented by restricting the
extent of disturbance and minimising the duration of soil exposure to adverse weather
conditions and effectively turf, cover or stabilise any disturbed area without delay and prior
to rainfall occurring.
Page 27 of 33
Document Set ID: 25021329
Version: 9, Version Date: 12/08/2026
Page 28
39. The developer must ensure sediment does not leave the site or enter onto adjoining
properties or Council’s drainage system due to surface runoff or on tyres of vehicles and/or
machinery. It is essential to implement appropriate approved erosion and sediment control
measures throughout the site during all phases of construction including vehicle shakedown
pad/grid (or similar) at the access to the construction site. Where sediments or other
contaminants are deposited on a road, they must be removed so as not to enter Council’s
drainage system or waterways.
Damage to Services and Assets
40. Any damage caused to existing services and assets as a result of the development works
must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets
must first be referred to the relevant service authority for approval.
PRIOR TO THE COMMENCEMENT OF THE USE
Certification/Supervision
41. Upon completion of the work a certificate must be issued by an RPEQ certifying that the
works have been constructed in accordance with the Operational Works permit.
42. A final inspection and approval of the new driveway and completed reinstatement works by
Council’s Inspector is required. Please contact Council on 5329 6500 to arrange for the
inspection.
43. Prior to commencement of use, for each stage, the following (prepared by respective
qualified persons* and certifying compliance with approvals) must be submitted to Council:
a. Landscaping certification confirming all works have been constructed in accordance
with conditions of approval.
b. AS2303:2018 certification for all street trees.
*(Refer to Advisory Note)
5. REFERENCE DOCUMENTS
Plan No. Rev. Plan/Document Name Date
2576-SBSMP-01 2.0 Site-Based Stormwater Management Plan 8 April 2026
prepared by Barlow Shelley
2576-SWMP-01 2.0 Waste Management Plan prepared by Barlow April 2026
Shelley
6. REFERRAL AGENCIES
The referral agencies applicable to this application are:
Referral Status Referral Agency and Referral Trigger Response
Address
Advice Agency Energy Queensland Schedule 10, Part 9, The agency provided its
Limited Level 6, 420 Division 2, Table 1, Item 1 response on 27 March
Flinders Street (10.9.2.1.1) – 2026 (Reference No.
Townsville QLD 4810 Reconfiguring a lot ECM 39501951-
subject to an easement 40677416). A copy of
Page 28 of 33
Document Set ID: 25021329
Version: 9, Version Date: 12/08/2026
Page 29
for the benefit of a the response is
distribution entity under attached.
the Electricity Act for a
supply network; or part of
the lot is within 100m of a
substation site
Schedule 10, Part 9,
Division 2, Table 2, Item 1
(10.9.2.2.1) – Material
Change of use of
premises within 100m of
a substation site or
subject to an easement
for the benefit of a
distribution entity under
the Electricity Act and the
easement is for a supply
network
Schedule 10, Part 9,
Division 2, Table 3, Item 1
(10.9.2.3.1) - Operational
Work on premises
subject to an easement
for the benefit of a
distribution entity under
the Electricity Act for a
supply network; or part of
the lot is within 10m of a
substation site
7. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form part
of the assessment manager conditions:
PLANNING
Aboriginal Cultural Heritage Act 2003
1. There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who
carries out an activity must take all reasonable and practicable measures to ensure the
activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the
duty of care. Substantial monetary penalties may apply to individuals or corporations
breaching this duty of care. Injunctions may also be issued by the Land and Resources
Tribunal, and the Minister administering the ACH Act can also issue stop orders for an activity
that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value
of Aboriginal cultural heritage.
You should contact the Cultural Heritage Unit to discuss any obligations under the ACH Act.
Equitable Access and Facilities
2. The plans for the proposed building work have NOT been assessed for compliance with the
requirements of the National Construction Code - Building Code of Australia (Volume 1) as
they relate to people with disabilities. Your attention is also directed to the fact that in addition
to the requirements of the National Construction Code as they relate to people with
disabilities, one or more of the following may impact on the proposed building work:
Page 29 of 33
Document Set ID: 25021329
Version: 9, Version Date: 12/08/2026
Page 30
a. the Disability Discrimination Act 1992 (Commonwealth);
b. the Anti-Discrimination Act 1991 (Queensland); and
c. the Disability (Access to Premises – Buildings) Standards.
Advertising Devices
3. All Advertising Devices must comply with Schedule 10 of Subordinate Local Law No.1
(Administration) 2015 including both temporary and permanent signage. All freestanding,
pylon or pole signs or signage that is illuminated requires approval from Council prior to being
installed. All signage identified in s6 of Schedule 10 of Subordinate Local Law No. 1 is
prohibited from being erected in the Shire.
Development Compliance Inspection
4. Prior to the commencement of the use, please contact Council's Development Assessment
Branch to arrange a Development Compliance Inspection.
Submission of Amended Plans Required
5. The conditions of this Decision Notice require resubmission of plan to Council with
amendments. Please address the amended plan/s to Council’s Development Assessment
Branch with the Reference No. MCU26/0040, OPW26/0066, RAL26/0013, separate to any
Operational Works application. To avoid delays and assessment issues with the Operational
Works application, it is recommended the plan/s be resubmitted prior to lodgement of any
Operational Works application. However, should the plan/s not be submitted, the applicant
is advised that a Preliminary Approval may be issued in lieu of a Development Permit.
Infrastructure Charges
6. All developments and/or changes to existing developments may require payment of
“Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution”
made pursuant to the planning legislation and regulations current at the time of issue. For
Further information, please refer to: https://www.noosa.qld.gov.au/Planning-and-
Development/Development-tools-and-guidelines/Infrastructure-Charges
Sustainability
7. Council encourages sustainable and energy efficient building design for all development,
including the use of sustainable building materials, energy efficient fittings, solar hot water,
photovoltaic systems (including the use of inverter/charges), solar panels, water saving
devices and rainwater harvesting.
Performance Bond Agreement
8. An applicant for a development application may make an agreement with an assessment
manager, referral agency or other person to establish the responsibilities, or secure the
performance, of a party to the agreement about a development condition.
Fires in Urban Areas
9. In urban areas fires are prohibited except where in an appliance is used for domestic heating
or cooking purposes, which must comply with particular standards. Any area identified as a
fire pit area on approved plans is to be in accordance with Local Law & Subordinate Local
Law No. 3, Schedule 3. Refer to the following link for details:
https://www.noosa.qld.gov.au/community/local-laws/local-laws-overview
Building and Construction Industry (Portable Long Service Leave) Levy
10. The QLeave levy must be paid prior to the issue of a development permit where it is required.
Council will not be able to issue a Decision Notice without receipt of details that the Levy has
been paid.
Page 30 of 33
Document Set ID: 25021329
Version: 9, Version Date: 12/08/2026
Page 31
Community Title Scheme - Private Infrastructure
11. All private infrastructure for the development must be designed to meet the planning scheme
requirements unless otherwise agreed by the relevant authority.
Road Reserve Permit
12. This development permit provides the applicant with written authority to undertake the
development in accordance with the conditions. Any additional activities that are undertaken
inside Council’s road reserve for the purpose of acting on this development permit may
require a Road Reserve Permit. These additional activities may include, but are not limited
to, hoarding, pedestrian diversions, laneway closures, etc. To apply for a Road Reserve
Permit, or for more information, Contact Council’s Road Reserve Officer at
[email protected] Sealing
13. All works required by this permit must be completed and accepted by Council prior to
submitting an application for plan sealing.
Biosecurity Act 2014 – Fire Ant Control
14. Developers must remain vigilant for the presence of fire ants. Under the Biosecurity Act 2014,
individuals and businesses are responsible for ensuring that they follow the movement
controls for specific organic materials to help prevent the spread of fire ants within South
East Queensland’s fire ant biosecurity zones. Movement of a fire ant carrier from within a fire
ant biosecurity zone may need a biosecurity instrument permit. More information is available
on https://www.fireants.org.au/treat/business-andindustry/movement-controls.
General Advisory Notes
15. As this driveway is a private structure, the owner bears full responsibly for the standard of its
construction, maintenance and any liabilities associated with its construction. It is
recommended that professional advice be sought for the construction of the driveway to
ensure that the driveway is constructed in accordance with standard drawings RS-051.
16. Council has undertaken an audit check of the Operational Works drawings in relations to the
proposed works. A detailed check of the calculations and drawings has not been undertaken,
as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects of
the engineering design. Council reserves the right to require further amendments and/or
additions at a later date should design errors become apparent.
17. Council reserves the right to call up any performance bond held or levy charges against the
property, should emergency works be required to be undertaken by Council to make the site
safe due to inactivity on the development site for extended periods of time.
18. Should any changes or modifications to the approved plans be required as a result of
construction constraints, a “Request to change an existing approval” under the Planning Act
2016 must be made. Amended plans clearly indicating the changes must be lodged with this
application along with the appropriate fees.
Prestart and Final Inspections Request
19. Contact Council on 5329 6500 to arrange a prestart or an inspection giving a minimum of 5
business days’ notice of preferred inspection time.
20. If Council officers are required to undertake additional inspections of the same works, a
reinspection fee will be applicable in accordance with Council’s Fees and Charges register
applicable at the time.
Environmental Advisory Notes
Page 31 of 33
Document Set ID: 25021329
Version: 9, Version Date: 12/08/2026
Page 32
21. The Environmental Protection Act 1994 states that a person must not carry out any activity
that causes, or is likely to cause, environmental harm unless the person takes all reasonable
and practicable measures to prevent or minimise the harm. Environmental harm includes
environmental nuisance. In this regard persons and entities, involved in the civil, earthworks,
construction and landscaping phases of this development are to adhere to their ‘general
environmental duty’ to minimise the risk of causing environmental harm.
Erosion and Sediment Control
22. Accepted best practice standards include International Erosion Control Association
Australasia Best Practice Erosion and Sediment Control.
23. Qualified Person, for the purpose of erosion and sediment control is a Certified Professional
in Erosion and Sediment Control (CPESC) or suitably experienced Registered Professional
Engineer of Queensland (RPEQ).
24. As a general rule, a site is determined to have achieved effective short-term stabilisation if
at the time of the plan sealing inspection:
a. Methods of stabilisation are:
• appropriate for slopes and slope lengths; and
• are consistent with best practice environmental management practices such as in
the Manual for Erosion and Sediment Control or the IECA Manual; and
b. Stormwater runoff from the site is not currently, and is not likely to result in visible
evidence of sedimentation or erosion, or lead to water contamination
Retention of Existing Trees
25. The existing trees on adjoining properties must be retained and protected during construction
wherever achievable. To avoid doubt, this advisory note is not intended to exclude the
operation of Chapter 3 of the Neighbourhood Dispute Resolution Act 2011 following
construction of the development which is the subject of this development approval.
Removal of Existing Trees and Vegetation
26. Stockpiling mulch to the appropriate volume and separation is required for fire mitigation as
well as optimum weed seed sterilisation.
Qualified Person
27. Qualified Person, for the purpose of:
a. Supervising landscape works and preparing a landscape certification, is considered to
be a landscape architect, landscape designer or horticulturist with a minimum of three
years current experience in the field of landscape design.
b. Undertaking landscape construction and establishment works is considered to be a
person with five years current experience in commercial landscape construction
projects.
c. Undertaking, supervising tree works and preparing arboriculture certification, is
considered to be a person with a minimum three years current experience in tree
protection, hazard identification/mitigation and AS2303:2018 Tree Stock for Landscape
Use assessment and either:
iii. International Society of Arboriculture (ISA) certification; or
iv. A Diploma of Arboriculture.
d. Managing Fauna protection is considered to be a certified Fauna Spotter Catcher.
Landscape Works
28. The applicant must pay the re-inspection fee in accordance with Council's Fees and Charges
Register where:
Page 32 of 33
Document Set ID: 25021329
Version: 9, Version Date: 12/08/2026
Page 33
e. An inspection revealed that any constructed rehabilitation/landscape works do not
comply with the conditions of the Decision Notice, Approved Plans and or Approved
Documents
f. Certification is submitted to Council falsely stating that works comply with the approved
plans, documents and or conditions of the Decision Notice.
8. PROPERTY NOTES
Not applicable.
9. VARIATION APPROVAL DETAILS
Not applicable.
10. FURTHER DEVELOPMENT PERMITS REQUIRED
Type of Development Permit Required Subject of the required Development Permit
Development Permit for Building Works All building work.
11. SUBMISSIONS
Not applicable.
12. RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Planning Act 2016 is attached.
During the appeal period, you as the applicant may suspend your appeal period and make written
representations to Council about the conditions contained within the development approval. If
Council agrees or agrees in part with the representations, a negotiated decision notice will be
issued. Only one negotiated decision notice may be given.
13. OTHER DETAILS
If you wish to obtain more information about the decision, electronic copies are available online at
www.noosa.qld.gov.au or at Council Offices.
Page 33 of 33