                                               Officer:          Glen Conforti
                                               Direct Telephone: (07) 5449 5379
                                               Response Address: PO Box 141, Tewantin QLD 4565
                                               Email:            [email protected]
                                               Our Reference:    2009/392
                                               Your Reference:   90063
1 May 2009

Suncert Pty Ltd
PO Box 673
MAROOCHYDORE QLD 4558



Dear Sir

                                       Decision Notice
                                    Integrated Planning Act 1997

I refer to your application and advise that on 30 April 2009 Council decided to approve the
application in full subject to conditions.
Details of the decision are as follows:

1        APPLICATION DETAILS

    Application No:                   2009/392
    Street address:                   23 Arakoon Crescent, Sunshine Beach
    Real property description:        Lot 772 RP 48111
    Planning Scheme:                  The Noosa Plan

2        DECISION DETAILS
The following type of approval has been issued:
        Preliminary Approval for Building Works – Alterations & Additions to Existing Dwelling

3        RELEVANT PERIOD OF APPROVAL
The relevant period for this Development Approval is identified in the Assessment Manager
conditions.

4        ASSESSMENT MANAGER CONDITIONS

1.       Development undertaken in accordance with this approval must generally comply with the
         approved plans of development: -
          Plan / Document No.      Rev.    Plan / Document Name                           Date
          Sheet 1                          Floor Plans                                    27 April 2009
          Sheet 2                          Floor Plan                                     27 April 2009
          Sheet 3                          Elevations                                     27 April 2009
          Sheet 4                          Elevations                                     27 April 2009
          Sheet 5                          Sections                                       27 April 2009
                                                                                            Page 1 of 6
Full text of the other 5 pages

Page 2

                                                                                        2009/392



      and as may be amended by these conditions and annotations on the plans.
2.    The development must be undertaken and operated in a manner that causes no detrimental
      effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
      lighting nuisance or other emissions.
3.    Earthworks required on site shall be carried out in accordance with Council’s Planning
      Scheme Policy PSP5 – Engineering Design Standards, so as not to cause the additional
      ponding of water on any adjoining lands or concentrate or direct overland flow on to an
      adjoining property.
4.    All new hot water systems installed shall be either solar systems; electric heat pump systems;
      or gas systems (LPG or natural).
5.    Existing trees on the site and within road reserves are to be retained, except where required to
      be removed due to building operations or the conduct of the approved use.
6.    All other vegetation shall be protected from interference resulting from clearing or construction
      activities by:
      6.1     Clearly marking vegetation to be retained with flagging tape;
      6.2     Installing protective fencing around the drip line of the vegetation;
      6.3     Stockpiling, storage and vehicle parking occurs in already cleared areas and does not
              cause interference with vegetation; and
      6.4     Low impact construction techniques are used around vegetation to minimise
              interference with the vegetation.
7.    Buildings and structures (including swimming pools, sheds, tennis courts or outbuildings) are
      not constructed under overhead electricity transmission lines, or within any easements.
8.    Sediment and erosion control measures must be placed on site prior to the works
      commencing and shall be maintained until all works are complete. The erosion and sediment
      control measures shall be in accordance with the “Best practice guidelines for control of
      stormwater on building sites” prepared by Healthy Waterways (available at
      www.healthywaterways.org).
Demolition
9.    Infrastructure including reticulated water, sewerage, stormwater, and electricity are to be
      protected from damage and made safe to the standard required by the regulatory authority;
10.   All building materials containing asbestos, including asbestos cement sheeting or roofing and
      lagging, must be removed from the building and disposed of in accordance with industry best
      practice.
11.   Waste generated during construction must be stockpiled in a centralised location and covered
      as required to prevent material being blown onto adjoining properties including the road
      reserve. All site waste must be disposed of to an approved waste disposal facility either
      directly or via an approved waste receptacle and collection service.
Relevant Period
12.   The Preliminary Approval lapses if the works have not been completed by 30 April 2011,
      unless an application to extend the relevant period is approved by Council.

5     REFERRAL AGENCY CONDITIONS
The referral agencies applicable to this application are:




                                                                                      Page 2 of 6

Page 3

                                                                                          2009/392




 Referral Trigger            Referral Status     Referral Agency         Referral Address

 Nil

6      APPROVED PLANS/DOCUMENTS
The approved plans and / or documents for this development approval are listed in the following
table:
 Plan / Document No.       Rev.    Plan / Document Name                        Date
 Sheet 1                           Floor Plans                                 27 April 2009
 Sheet 2                           Floor Plan                                  27 April 2009
 Sheet 3                           Elevations                                  27 April 2009
 Sheet 4                           Elevations                                  27 April 2009
 Sheet 5                           Sections                                    27 April 2009

7      ADVISORY NOTES

The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1.     The requirements of the Environmental Protection Amendment Regulation (No. 2) 1999 and
       Local Law No. 12, prevents a builder or building contractor carrying out building work on a
       building site in a way that makes or causes audible noise to be made from the building work:-
       1.1.   On a Sunday or public holiday, at any time; or
       1.2.   On a Saturday or a business day, before 7.00am or after 6.30pm.
       A maximum penalty of $1,500 applies to an offence under this legislation.
2.     Prior to the commencement of the development, a plumbing assessment must be obtained
       from Noosa Council’s Plumbing Services Section in accordance with the Plumbing & Drainage
       Act 2002 (as applicable).
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act
can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural
heritage or the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.




                                                                                        Page 3 of 6

Page 4

                                                                                      2009/392



8      PROPERTY NOTES
Not applicable

9      PRELIMINARY APPROVAL OVERRIDING SCHEME
A preliminary approval under section 3.1.6 of Integrated Planning Act 1997 has been granted and as
such the level of assessment and applicable codes for any development approval resulting from this
approval are identified in the conditions.

10     FURTHER DEVELOPMENT PERMITS REQUIRED

 Type of Development Permit required         Subject of the required Development Permit
 Development Permit for Building Works       All Building Works

11     SELF ASSESSABLE CODES
The developer must comply with the following codes for self-assessable development related to the
development approved under this Decision Notice:
Detached House Driveways Code

12     SUBMISSIONS
Not applicable

13     REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME
Not applicable

14     RIGHTS OF APPEAL

You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Integrated Planning Act 1997 is attached.
During the appeal period, you as the applicant may make written representations to Council about
the conditions contained within the development approval. If Council agrees or part agrees with the
representations, a “negotiated decision notice” will be issued. Only one “negotiated decision notice”
may be given. Taking this step will defer your appeal period, which will continue after Council makes
its decision. (Refer to sections 3.5.17 and 3.5.18 of the Integrated Planning Act 1997).

15     OTHER DETAILS
Should you wish to obtain more information about Council’s decision electronic copies are available
on line at www.sunshinecoast.qld.gov.au, or at Council Offices.
Yours faithfully,




Denis Wallace
SENIOR PLANNING OFFICER




                                                                                    Page 4 of 6

Page 5

                                                                                                       2009/392



                                                        Appeal Rights
                                                    INTEGRATED PLANNING ACT 1997 & 1998 REGULATION




The following is an extract from the Integrated
                                                                    (6) If an application involves assessment against a
Planning Act (Chapter 4).                                      concurrence agency code, appeal rights for submitters
Division 8 - Appeals to court relating to                      for the application are not available against the part of
development applications                                       the approval that represents the concurrence agency’s
                                                               response for the code.
Appeals by applicants
                                                               Appeals by advice agency submitters
4.1.27.(1) An applicant for a development application
may appeal to the court against any of the following-          4.1.29.(1) An advice agency may, within the limits of
                                                               its jurisdiction, appeal to the court about the giving of a
(a) the refusal, or the refusal in part, of a development      development approval for a development application
      application;                                             if-
(b) a matter stated in a development approval,                 (a) the development application involves impact
      including any condition applying to the                      assessment; and
      development, and the identification of a code
      under section 3.1.6;1                                    (b) the advice agency told the applicant and the
                                                                   assessment manager to treat its response to the
(c) the decision to give a preliminary approval when a             application as a submission for an appeal.
      development permit was applied for;
                                                                  (2) The appeal must be started within 20 business
(d) the length of a relevant period;                           days after the day the decision notice or negotiated
(e) a deemed refusal.                                          decision notice is given to the advice agency as a
    (2) An appeal under subsection (1)(a) to (d) must          submitter.
be started within 20 business days (the “applicant’s           Appeals for matters arising after approval given
appeal period”) after the day the decision notice or           (co-respondents)
negotiated decision notice is given to the applicant.          4.1.30.(1) For a development approval given for a
    (3) An appeal under subsection (1)(e) may be               development application, a person to whom any of the
started at any time after the last day a decision on the       following notices have been given may appeal to the
matter should have been made.                                  court against the decision in the notice-
Appeals by submitters                                          (a) a notice giving a decision on a request for
4.1.28.(1) A submitter for a development application               extension of the relevant period for an approval;
may appeal to the court about-                                 (b) a notice giving a decision on a request to make a
(a) the giving of a development approval, including                minor change to an approval.
      any conditions (or lack of conditions) or other              (2) The appeal must be started within 20 business
      provisions of the approval; or                           days after the day the notice of the decision is given to
(b) the length of a relevant period for the approval.          the person.
    (2) The appeal must be started within 20 business                (3) Subsection (1)(a) does not apply if the
days (the “submitters appeal period”) after the day            approval resulted from a development application
the decision notice or negotiated decision notice is           (superseded planning scheme) that was assessed as
given to the submitter.                                        if it were an application under a superseded planning
                                                               scheme.
    (3) If a person withdraws a submission before the
application is decided, the person may not appeal the             (4) Also, a person who has made a request
decision.                                                      mentioned in subsection (1) may appeal to the court
                                                               against a deemed refusal of the request.
    (4) If an application involves both impact
assessment and code assessment, appeal rights for                 (5) An appeal under subsection (4) may be started
submitters are available only for the part of the              at any time after the last day the decision on the
application involving impact assessment.                       matter should have been made.
    (5) If an application is processed under section           Division 9 - Appeals to court about other matters
6.1.28(2), appeal rights for submitters for the                Appeals for matters arising after approval given
application are available only for the aspects of the          (no co-respondents)
development that would have required public
notification under the repealed Act.                           4.1.31.(1) A person to whom any of the following
                                                               notices have been given may appeal to the court
                                                               against the decision in the notice-
                                                               (a) a notice giving a decision on a request to change
                                                                   or cancel a condition of a development approval.
1
     Section 3.1.6 (Preliminary approval may override
    local planning instrument)
                                                                                                     Page 5 of 6

Page 6

                                                                                                    2009/392

(b) a notice under section 6.1.442 giving a decision to     (d) the length of a period mentioned in section 3.5.21
    change or cancel a condition of a development                 relevant period;
    approval.                                               (e) a deemed refusal.
    (2) The appeal must be started within 20                    (2) An appeal under subsection (1)(a) to (d) must
business days after the day the notice of the decision      be started within 20 business days (the “applicant’s
is given to the person.                                     appeal period”) after the day the decision notice or
   (3) Also, a person who has made a request                negotiated decision notice is given to the applicant.
mentioned in subsection (1)(a) may appeal to the                (3) An appeal under subsection (1)(e) may be
court against a deemed refusal of the request.              started at any time after the last day a decision on the
    (4) An appeal under subsection (3) may be               matter should have been made.
started at any time after the last day the decision on      The Registrar for the Building and Development
the matter should have been made.                           Tribunal may be contacted at the website
Appeals against decisions to change approval                http://www.localgovernment.qld.gov.au/
conditions under the repealed Act
4.1.33A.(1) A person who is dissatisfied with a
                                                            For Infrastructure Charges Only
decision made on an application to change the               4.1.36 Appeals about particular infrastructure
conditions attached to an approval given under              charges
section 2.19(3)or section 4.4 of the repealed Act may       (1) This section applies to a person who has been
appeal to the court against-                                given, and is dissatisfied with, an infrastructure
(a) the decision; or                                        charges notice or a regulated State infrastructure
(b) a deemed refusal of the application.                    charges notice.
    (2) An appeal under subsection (1)(a) must be           (2) The person may appeal to the court against the
started within 20 business days after the day notice of     notice.
the decision is to be given to the person.                  (3) The appeal must be started within 20 business
    (3) An appeal under subsection (1)(b) may be            days after-
started at any time after the last day a decision on the    (a) if the notice is given because of a development
matter should have been made.                                    approval or master plan approval-the day the
Appeals against local laws                                       applicant is given notice of the decision about the
                                                                 approval; or
4.1.33B.(1) An applicant who is dissatisfied with a
decision of a local government or the conditions            (b)    otherwise-the day the notice is given to the
applied under a local law about the use of premises or             person.
the erection of a building or other structure permitted     (4) An appeal under this section may only be about-
by the planning scheme may appeal to the court              (a) whether a charge in the notice is so
against the decision or the conditions applied.                  unreasonable that no reasonable relevant local
    (2) The appeal must be started within 20 business            government, State infrastructure provider or
days after the day notice of the decision is given to the        coordinating agency could have imposed it; or
applicant.                                                  (b) an error in the calculation of the charge.
For Building Works Only                                     (5) To remove any doubt, it is declared that an
Rights of appeal conferred by Section 4.2.9 of the          appeal under this section can not be about the
Integrated Planning Act 1997 as follows:                    methodology used to establish the charge in the
                                                            relevant infrastructure charges schedule or regulated
Division 3 – Appeals to tribunals relating to
                                                            State infrastructure charges schedule.
development applications
Appeals by applicants
4.2.9(1) An applicant for a development application
may appeal to the Building and Development Tribunal
against any of the following-
(a) the refusal, or the refusal in part, of a development
    application;
(b) a matter stated in a development approval,
    including any condition applying to the
    development, and the identification of a code
    under section 3.1.6;3
(c) the decision to give a preliminary approval when a
    development permit was applied for;


2
   Section 6.1.44 (Conditions may be changed or
  cancelled by assessment manager or concurrence
  agency in certain circumstances)
3
   Section 3.1.6 (Preliminary approval may override
  local planning instrument)
                                                                                                 Page 6 of 6

Used in these records

About this file

File size
55 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2009.00000392.001 [As Published].pdf · 55 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.