Field and weather station measurements of rainfall, wind and atmospheric pressure were recorded and
used as part of the data interpretation and refinement of the CSM.
6.5.2. DSI 2 LFG WORKS AND SAMPLING PROCEDURE
With reference to Section 3.4.5 and Appendix A4 of NSW EPA 2020, to further investigate LFG at the site
the following scope was completed:
• Installation of 7 LFG bores, fitted with quick connect nipples, to between 1.6 and 2.3mbgl over AEC 1
(refer to Drawing 1 Appendix A and logs presented at the end of Appendix G)
• Bores left to ‘rest’ for at least 7 days
• Remobilise to site to perform a round of monitoring on the 7 LFG bores and 4 groundwater bores
using a calibrated “GA5000” landfill gas monitor (refer to Appendix O for calibration certificate) for
methane (CH4), hydrogen sulfide (H2S4), carbon dioxide (CO2), carbon monoxide (CO), oxygen (O)
and barometric pressure and pressure differential at each LFG bore.
6.6. QUALITY ASSURANCE AND QUALITY CONTROL PLAN
6.6.1. QUALITY ASSURANCE PROCEDURES
The following quality control program was implemented for the assessment, with quality assurance
elements including:
• Using qualified and experienced personnel to conduct the field investigation,
• Compliance with the SAQP and other site-specific project plans,
• Using a NATA registered laboratory for sample analysis,
• Despatching samples using appropriate chain of custody procedures,
• Referring to procedures for soil, water and LFG sampling, field testing and decontamination within:
○ National Environment Protection Council (NEPC), 1999, as amended 2013. National Environment
Protection (Assessment of Site Contamination) Measure (NEPM)
○ Standards Australia, Guide to the investigation and sampling of potentially contaminated soil.
AS4482.1 – 2005
○ NSW EPA Contaminated Land Guidelines, Sampling design part 1 – application, August 2022
(NSW EPA 2022)
○ NSW EPA Contaminated Land Guidelines - Assessment and management of hazardous ground
gases, 2020 (NSW EPA 2020)
○ NSW EPA Environmental Guidelines, Solid waste landfills, Second edition, 2016 (NSW EPA
2016)
○ DES (now DESI), 2018 as updated 18 May 2023, Queensland auditor handbook for
contaminated land: Module 6: Content requirements for contaminated land investigation
documents, certifications and audit reports. Brisbane: Department of Environment and Science,
Queensland Government (ESR/2018/4224 as updated 18/5/23) (Module 6)
○ Heads of EPA Australia and New Zealand (2020) PFAS National Environmental Management
Plan Version 2.0 (NEMP)
125 Lot 105 SP118458 Cooroy DSI 12062024 Rev0 Lot 105 SP118458, Cooroy, QLD, 4563
12/06/2024 50 Detailed Site Contamination Investigation
Document Set ID: 23717062
Version: 0, Version Date: 01/01/1900
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.