Original source · versioned page text
MCU22/0051 Representations To Development Approval For Material Change Of Use - Hardware & Trade Supplies At 178 Eumundi Noosa Road, Noosaville · Attachment 1 (MCU22/0051) Proposed Amended Conditions
c. Vegetative screening of any electrical transformers, bin storage areas and the like
from the road frontage;
d. Provision of 1 street tree within the road reserve for every 8 metres of road frontage
(excluding driveways).
e. Landscape or architectural treatments that soften the appearance of the retaining
walls and industrial building along the northern boundary.
20. Security in the form of a cash bond or trading bank guarantee to the sum of $20,000 must
be submitted to Council, to secure performance of all conditions of this approval, prior to the
issue of a Development Permit for Operational Works. The cash bond or trading bank
guarantee will be returned on completion of the development subject to satisfactory
performance of the conditions of approval at that time less any costs incurred by Council in
respect of enforcing performance of this permit. Council reserves the right to call upon the
bond or guaranteed sum to effect compliance with conditions.
21 The disturbance and release of Acid Sulphate Soils must be avoided by:
a. Undertaking an Acid Sulfate Soils investigation and soil analysis pursuant to the
National Acid Sulfate Soils Guidance.
b. not excavating or otherwise removing soil or sediment containing ASS;
c. not permanently or temporarily extracting groundwater that results in the aeration
of previously saturated ASS; and
d. not undertaking filling on land at or below 5 metres AHD that results in:-
i. actual ASS being moved below the water table; or previously saturated ASS
being aerated.
Where potential or actual Acid Sulfate Soil is identified, all works must be caried out in
accordance with an Acid Sulfate Soils Management Plan prepared by a qualified person*.
Certification from a suitably qualified person that all works have been undertaken in
accordance with the Acid Sulfate Soil Management Plan must be provided to Council.
*(Refer to Advisory Note)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original