RFI engineering - 20230504 RFI response
b. demonstrate the lid type of proposed stormwater structure 1/A and how the structure
will be constructed to avoid trip hazards in the road reserve; and
The pit within the road reserve has been updated to a closed manhole lid to minimise
potential trip hazards.
c. demonstrate that the existing services along the Myall Street frontage will not be
impacted by proposed stormwater lines 2/A – 1/A and 1/A – EX/A (including vertical
clearances).
Sewer main depths from Unity Water and indicative water service levels have been added
to the stormwater longsections to demonstrate clearance. The sewer main invert is located
at a level of between 110.35m and 110.74m with approximate I.L. at the crossing point
110.52m. The lowest invert for the proposed drainage line is 112.5m therefore the required
cover over sewer is achieved.
Water main depth has been assumed and may vary between 600mm and 1.5m along the
frontage in accordance with the SEQ Water and Unity Water standards. The actual depth
will require potholing by the contractor to confirm final levels prior to any future operational
works commencing. An annotation has been added to the stormwater long sections noting
that the contractor will be required to adjust the water services in accordance with Unity
Water requirements levels to achieve the required cover should there be a service conflict
within the road reserve with the proposed stormwater line.
Issue: Stormwater Quality
7. Provide updated plans, SWMP and MUSIC model which only applies nutrient removal
rates for proprietary products if they have been verified through SQIDEP.
Proprietary products have been removed from the treatment line. Modelling has been
revised to take into account treatment from the proposed rainwater reuse tanks, as well as
the treatment from the bioretention area which was found to achieve the required level of
stormwater quality pollutant reduction for the site. Please refer to the updated SWMP for
further details.
8. Provide survey of the downstream existing pit in Myall St in order to demonstrate that
the bioretention sub-soil drains can freely discharge.
The configuration of the proposed bioretention area makes use of a drop pit to which the
subsoil drains will discharge. Subsoil drains will have an invert of approximately 114.4,
and the outlet invert from the pit will be at nominally RL 113.6. The surface level of the
downstream kerb inlet pit has been identified as 113.13m from LiDAR topography being
below the level of the outlet pipe from the site. The bioretention sub-soil drains will
therefore remain free draining under the proposed conditions as the elevation of the
pipes above the downstream levels prevents water being able to back up to the proposed
design levels.
P +61 7 5211 1003 A 75 Noosa Dr, Noosa Heads Qld 4567 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (RFI engineering - 20230504 RFI response.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.