RFI engineering - 20230504 RFI response
Survey of the downstream pit will be required with detailed design, however there is
currently sediment build up within the pit which will require pressure jet cleaning to
determine the invert and final connection level.
Issue: Sustainable Building Design Code
9. Provide updated plans and a SWMP which incorporates rainwater collection and reuse at
the site, sufficient to supply external non-potable fixtures such as communal landscape
irrigation and bin washdown.
The plans and SWMP have been updated to demonstrate the rainwater collection and reuse
proposed for the site. As described in the report, 11 units would nominally require a
33,000kL reuse volume to comply with the accepted outcomes of the sustainable building
code. The development proposes a total reuse capacity of 50kL of reuse storage in addition
to the 50kL of rainwater attenuation proposed.
Issue: Landscape Setbacks
10. Provide plans or information demonstrating that meaningful landscaping in the form of
tree species can be planted and maintained in the bio-retention swale. Specific attention is
to given to screening of the building, common areas, driveways and retaining walls on site.
The bioretention depth has been increased to a nominal 1m depth of filter media to ensure
deep rooting plants and trees are able to be established within the bioretention swale. For
further information, refer to the town planning response and architectural landscaping
plans.
11. Provide further sections/plans that detail the contours and levels of the adjoining site
at 9 Myall Street in relation to the earthworks, retaining walls and fences proposed.
The sections and plans have been updated information about the levels in the adjacent
property. LiDAR data from the Noosa-Gympie 2015 aerial survey project has been used to
supplement the survey data to provide this information. Due to the nature of LiDAR data,
there are some minor discrepancies between the survey and lidar data levels, however for
information purposes the data is considered to be suitably representative of the local
conditions.
Issue: Waste Management
16. Provide a waste management plan for the site demonstrating that sufficient area is
available on site for both general waste and recycling bins.
A waste management plan addressing this request has been prepared for the development
and is included within the attachments.
P +61 7 5211 1003 A 75 Noosa Dr, Noosa Heads Qld 4567 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (RFI engineering - 20230504 RFI response.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.