RFI engineering - 20230504 RFI response
17. Detail the location of a bin wash down area on site.
Please refer to the proposed development plans for the location of the bin wash down area.
The wash down area is to be provided with a sump which will capture the dirty water and
discharge it to the sewer within the site. The sump and drainage from the wash down is to
conform to the hydraulic engineer’s specification.
18. Provide amended plans that detail the relocation of the bin area away from the Maple
Street frontage. In this regard a landscape setback is to be provided to Maple Street with
the bins in a location not visible to the street.
Refer to the updated plans which have relocated bins away from the frontage with a
landscaped set back to reduce their visibility from the street.
We believe that the above satisfactorily addresses the matters raised in the above
information request however, should additional information be required, please contact
our office directly.
Yours faithfully,
RECOR Pty Ltd
Prepared by
Ben Parry
Civil Engineer
BEng (Hons), MIEAust CPEng NER RPEQ
RPEQ: 28084
P +61 7 5211 1003 A 75 Noosa Dr, Noosa Heads Qld 4567 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (RFI engineering - 20230504 RFI response.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.