Original source · versioned page text
MCU24/0084 Material Change Of Use - Function Facility – 658 Louis Bazzo Drive, Ringtail Creek · Attachment 2 - (MCU24 0084) - Planning Officer'S Report
PLANNING & ENVIRONMENT COMMITTEE MEETING REPORT 10 DECEMBER 2024 Bushfire Management The site contains areas, including the access that are mapped either for High Potential Bushfire Intensity or Potential Impact Buffer. To address this constraint a Bushfire Hazard Assessment and Management Plan has been submitted to Council. A Bushfire Emergency Response Plan (BERP) has also been prepared to assist management to protect life and property in the event of a bushfire or a pending bushfire on the site. The bushfire hazard assessment has provided a detailed assessment generally in accordance with the methodologies detailed in the State interest guidance material and supporting QFES Bushfire Resilient Communities (October 2019) technical reference guide. Further, an assessment has been undertaken against the Bushfire Hazard Overlay Code. The development is consistent with and can comply with the relevant Acceptable Outcomes, Performance Outcomes and the Overall Outcomes sought by the Bushfire Hazard Overlay Code. The conditioned upgrades to the driveway provide a suitable means of evacuation. A condition is proposed that requires a suitably qualified RPEQ, as part of a future operational works, to design all evacuation routes and waterway crossings to cater for the types of vehicles expected to access the site (i.e. 2WD, MRV, passenger bus, etc). A minor amount of vegetation clearing/delimbing may be required to facilitate the vehicular access recommendations about the waterway crossings for the emergency alternative access route to achieve a minimum 3.5m width and 4.8m vertical clearance. All vegetation clearing required to facilitate the vehicular access recommendations can likely be carried out as exempt clearing under the routine management. Geotechnical The marquee is located on land affected by the moderate landslide hazard overlay mapping. Confirmation of this hazard will be provided as part of a geotechnical investigation report. In the event the site is affected by a landslide hazard, appropriate design and construction measures will be adopted in accordance with the recommendations of a geotechnical engineer at the detailed design phase of the development and prior to approval being given for building works. Stormwater Management A Stormwater Management Plan has been submitted with the application to assess the impact of the quantity and quality of stormwater resulting from the proposed development. The submitted Stormwater Management Plan states: The plan demonstrates that the development does not increase the peak flow discharge or worsen the stormwater quality. Roofwater is to be collected and discharged via pipe and outlet directly into the dam. The remaining hardstand and other impervious areas are to match predevelopment flow (i.e., sheet flow). Council’s Senior Development Engineer has reviewed and agrees with the submitted Stormwater Management Plan, the plan recommends that appropriate sediment and erosion control fencing will also be utilised during construction/earthworks. Proposed landscaping of the development footprint utilises native flora species found in the local regional ecosystems to stabilise the site. 4. CONSULTATION 4.1. Referral Agencies The application was referred to the following Referral Agencies: • Department of State Development, Infrastructure, Local Government and Planning (SARA) The Department is a referral agency for Development in a State-controlled Road environment, as identified in Section 1.6 and section 5.1.3 of this report, and in accordance with Schedule 10 of the Planning Regulation 2017.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.